Project Management Using

نویسندگان

  • Christian Wild
  • Kurt J. Maly
  • Chenglin Zhang
  • Dave E. Eckhardt
  • Cathy C. Roberts
  • Daniela Rosca
  • Tamara Taylor
چکیده

This paper describes our experience in using a multimedia project management and software engineering environment, Decision-based Hyper-multimedia CASE (DHC), to support the Low-Visibility Landing and Surface Operations (LVLASO) project at the NASA Langley Research Center. 1 The purpose of the LVLASO project is to allow pilots to land and taxi airplanes when visibility is impeded due to adverse weather conditions. NASA is supporting this eeort by developing new cockpit systems concepts for use on the ight deck. We are utilizing DHC to capture the decisions and documents generated during this project's life cycle. DHC supports a new Decision-based Systems Development paradigm, which allows the organization of the project by the decisions which shape the end-products and associated documents. This paper describes our current understanding of using a hyperlinked multimedia project space in developing large, group collaborative projects. The Low Visibility Landing and Surface Operations (LVLASO) Project was recently initiated as part of the Terminal Area Productivity (TAP) program at NASA. The goal of the LVLASO project is to enhance pilots' abilities to land and taxi their planes when visibility is impeded due to adverse weather conditions. New mission capability, including hardware, software, and procedural elements, is being developed for this purpose; for example, a new \taxi-map" display is a candidate for placement in the airplane's cockpit. This new display will show the pilot (in real-time) the position of the plane on the runway or taxiway, and will provide the pilot with enhanced situation awareness and route planning capability.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Using fuzzy FMEA and fuzzy logic in project risk management

Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...

متن کامل

Estimation of Project Performance Using Earned Value Management and Fuzzy Regression

Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...

متن کامل

A COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION

<span style="color: #000000; font-family: Tahoma, sans-serif; font-size: 13px; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: auto; text-align: justify; text-indent: 0px; text-transform: none; white-space: normal; widows: auto; word-spacing: 0px; -webkit-text-stroke-width: 0px; display: inline !important; float: none; backgro...

متن کامل

A COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION

<span style="color: #000000; font-family: Tahoma, sans-serif; font-size: 13px; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: auto; text-align: justify; text-indent: 0px; text-transform: none; white-space: normal; widows: auto; word-spacing: 0px; -webkit-text-stroke-width: 0px; display: inline !important; float: none; backgro...

متن کامل

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

تعیین ضریب عملکرد پروژه در مدیریت ارزش کسب شده با استفاده از مدیریت ریسک به منظور تخمین نتایج پایانی کار پیمانکاران

One of the common questions in all projects, is "How much would be the final cost of the project?" or "How much would be the completion duration of the project?". Earned Value Management presents a method for estimation of these results. In general methods and formula of Earned Value Management, future trend of project, are anticipated completely based on its previous trend, and changes in envi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1998