Understanding bi-project management: engineering complex industrial construction projects
نویسندگان
چکیده
Engineering large industrial construction projects is usually a complex task involving several co-operating actors. This paper investigates a specific type of such projects, labelled bi-project management. Bi-project management is characterised by two main actors, each of whom manage a part of the project: the owner of the installation (the client organisation) responsible for the engineering of the production process part, and an engineering office responsible for the construction related part. This paper describes and analyses what an engineering office can do to improve control of its part of the project, knowing that its part must be completed in advance; in addition, it is dependent on the client’s part and must adapt to any changes the client may make. A framework for analysis and control has been developed, which distinguishes four areas. Two areas (key documents and basic interaction structure) are based on normal project control practices. The two remaining areas have been added to deal with the technological uncertainty and planning structure of the client organisation. The framework helps elucidate the specific nature of bi-project management. Effective bi-project management should not only apply normal project management practices, but also anticipate risks and postpone work to the last possible moment. A main topic for future research is to identify the underlying causes for uncertainty in these types of projects. # 2002 Elsevier Science Ltd and IPMA. All rights reserved.
منابع مشابه
Developing a fuzzy group decision making approach for project manager selection considering the static complexity of construction projects
Due to the particular importance of projects in human life and in organizations, proper project management has been always regarded highly by researchers and practitioners. Recent advances in technology and fundamental changes in most scientific areas have affected projects and made their nature and environmental circumstances much more complex than in the past. Fortunately, in recent years, ma...
متن کاملMethodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...
متن کاملThe Role of RFID to Improve Materials Flow in Mega-projects Site
In according to quantity of various consumption materials in construction sites of complex projects such as oil industry, infrastructure, and large scale commercial, management and monitoring of materials can affect on the final time and cost of project’s activities. In today’s world of rising labor costs and labor shortages, automated materials tracking can provide some advantage to impr...
متن کاملThe Role of RFID to Improve Materials Flow in Mega-projects Site
In according to quantity of various consumption materials in construction sites of complex projects such as oil industry, infrastructure, and large scale commercial, management and monitoring of materials can affect on the final time and cost of project’s activities. In today’s world of rising labor costs and labor shortages, automated materials tracking can provide some advantage to impr...
متن کاملAn Appropriate Framework in the Area of Organization Knowledge Management of Civil Projects Using a Dynamic Model
The world economic image has been changing. It has been a long time since the sole important resources of an organization were financial and physical. In the newly-emerged global economy, knowledge and information are accounted as the most significant resources in order to produce value. Obviously, as the demand for knowledge to reach success is increasing day by day, maintenance and enhancemen...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2015