Study on Production Scheduling System for Project-based Remanufacturing
نویسنده
چکیده
Project-based remanufacturing is a kind of service-driven remanufacturing mode, and production scheduling is one of the important issues for project-based remanufacturing system operation. Many uncertain factors exist in the remanufacturing system which lead to the traditional single production scheduling model and approach can not satisfy the requirements for production scheduling in the process of remanufacturing. This paper put forward a system framework and operation process for project-based remanufacturing production scheduling system from the viewpoint of integration. On the basis, the models of project-based remanufacturing production scheduling system were constructed by web services technologies and the Model-driven architecture was used to construct the production scheduling system. The study result provided a feasible production scheduling solution for project-based remanufacturing system and can satisfy the requirements for the scheduling problems in project-based remanufacturing system.
منابع مشابه
Multiple Destination Influence on Production Scheduling in Multi-element Mines
In multi-element deposits, different blocks are blended together to create a product with a predetermined quality. Generally, blending aims to obtain a special quality and quantity based on determining the processing plant or customer needs. However, blending causes different products based on the deposit properties. Thus, a block is blended with others to create one of many possible products. ...
متن کاملA New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets
Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...
متن کاملSoft Computing in Product Recovery: A Survey Focusing on Remanufacturing System
This paper focuses on the application of soft computing in remanufacturing system, in which end-of-life products are disassembled into basic components and then remanufactured for both economic and environmental reasons. The disassembly activities include disassembly sequencing and planning, while the remanufacturing process is composed of product design, production planning & scheduling, and i...
متن کاملDEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY
Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...
متن کاملMulti-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy
In this research we study the multi-product economic lot scheduling problem (ELSP) with manufacturing and remanufacturing opportunities. Manufacturing and remanufacturing operations are performed on the same production line. Both manufactured and remanufactured products have the same quality thus fulfil the same demand stream. Tang and Teunter (2006) firstly studied this type of economic lot sc...
متن کامل