Installation of Main Components

نویسندگان

  • M. Mauri
  • P. Musumeci
  • D. Pelliccia
  • M. Petrarca
چکیده

The SPARC project has entered its installation phase at the Frascati National Laboratories of INFN: its main goal, the promotion of an R&D activity oriented to the development of a high brightness photoinjector to drive SASE-FEL experiments, is being vigorously pursued by a collaboration among ENEA-INFN-CNR-Universita` di Roma Tor Vergata-INFM-ST. In this paper we will report on the installation and test of some major components, like Ti:Sa laser system, RF gun and RF power system. Advancements in the control and beam diagnostics systems will also be reported, in particular on the emittance-meter device for beam emittance measurements in the drift space downstream the RF gun. Recent results on laser pulse shaping show the feasibility of producing 10 ps flat-top laser pulses in the UV with rise time below 1 ps. First FEL experiments have been proposed, using SASE, seeding and non-linear resonant harmonics. INSTALLATION OF MAIN COMPONENTS The SPARC project is by now in its advanced installation phase at LNF; tests of related equipments and instrumentation are also under way. The 150 MeV S-band photo-injector and the 12 m undulator for the FEL experiments are located inside an underground bunker, which hosts as well the clean room containing the Ti:Sa laser system driving the photo-cathode. As discussed elsewhere [1], the project aims at conducting a bouquet of advanced experiments in the production, characterization and control of high brightness electron beams, as those required by X-ray FEL’s and advanced high gradient acceleration techniques (plasma, IFEL, etc.). Figure 1: Layout of SPARC photo-injector, with RF-gun, 3 S-band accelerating sections and FEL undulator (6 modules). Beam line for undulator by-pass is also shown. The layout of the machine, shown in Fig.1, displays a RF-gun, 3 S-band SLAC-type accelerating sections, and a 6-module 12-m long undulator for SASE and seeded FEL experiments in the 88-500 nm wavelength range. The installation of the RF source and distribution system started last month. The klystron pulsed power modulators, supplied by PPT, have been positioned in the SPARC klystron hall, as well as the klystrons (45 MW, SLAC-PUB-11650 Contributed to 2005 Particle Accelerator Conference, 16-20 May 2005, Knoxville, TN, USA 2856 MHz, TH2128C model manufactured by Thales), as shown in Fig.2. The modulator connections with various controls and ancillary systems are being made. Modulators can switch the klystrons at a maximum rep. rate of 10 Hz, with HV pulses of 310 kV – 340 A. The modulator power test, scheduled at the end of this month, will be performed initially with the klystron operating in diode-mode. The installation of waveguide distribution network and RF devices (circulators, shifters, etc.) will begin next month. Figure 2: SPARC klystrons with oil tanks installed in the SPARC building (upper facility room or klystron hall). The 1.6-cell RF gun and the emittance-compensation solenoid have been delivered at LNF in February from UCLA [2]. The gun supports are being modified to gain full control of the gun axis alignment. The water flow into the gun has been measured up to 5 l/m, a value that should allow control of the gun temperature at the level required for operation up to 10 Hz. The magnetic solenoid yoke has been assembled and it is also going through some minor mechanical modifications. The solenoid uses 4 different coils that can be independently excited. The magnetic field will be measured to check for axis misalignments and to record longitudinal magnetic field profiles in the different current configurations. The full system should be fully tested, mounted and aligned by mid summer and ready for RF power tests in September. Two accelerating sections will be delivered next July by Mitsubishi, while one of the two sections given by SLAC to SPARC, as part of a collaboration agreement, is under test. As shown in Fig.1, the first accelerating section will be embedded (see yellow zone) in an array of solenoids, required to produce a magnetic field for additional focusing in order to comply with the Ferrario working point[3] matching conditions for emittance compensation. Thanks to a newly funded European project, EUROFEL, an additional array of solenoids will be built and installed around the second section, in order to further improve the performances of emittance compensation in particular when RF compression is applied [4]. The Ti:Sa laser system, built by Coherent, is now under final acceptance tests. The oscillator is already installed inside the clean room in the SPARC bunker, while the amplifier is being shipped by Coherent to LNF for final acceptance tests of the whole laser system: these will be conducted next month at LNF. The HIDRA-50 amplifier system, made of one regenerative and two multi-pass amplifiers, has already reached the specs in the infra-red, delivering 50 mJ of output pulse energy with 104 fs pulses and good beam quality (Mx=1.9 and M 2 y =1.6). Preliminary tests in the UV (266 nm), performed after the third harmonic crystal and the UV stretcher, showed the capability to reach 1.8 mJ of pulse energy with quite good pulse-to-pulse stability, i.e. less than 4.5%, and a fairly good beam quality, i.e. Mx=2.7 and M 2 y =1.9 . These tests will be further completed at LNF soon. Figure 3: HIDRA-50 amplifier for the SPARC laser. A preliminary measurement of the time jitter between the laser oscillator and an external reference 79 MHz RF wave was performed at LNF. The signal from a photodiode looking at the optical pulse train, properly filtered and amplified, was mixed with a portion of the 79 MHz wave driving the oscillator phase-locking loop. Figure 4: Output spectrum of laser oscillator. The relative phase between the two signals was measured by monitoring the mixer output: an upper limit of 1.4 ps was found. A characterization of the oscillator output spectrum was also performed, showing a quite good behavior (see Fig.4). The emittance-meter device has been completed, as shown in Fig.5, and is ready to be installed in the drift line after the RF gun and focusing solenoid system, in order to conduct measurements of the rms normalized transverse emittance as a function of the drift length. This measurements will be performed at the beginning of next year running the beam at the RF-gun exit energy of 5.7 MeV, before installation of the 3 accelerating sections. Figure 5: Emittance-meter device with long bellows. BEAM DYNAMICS STUDIES Beam dynamics studies have moved further than previously reported[1]. The study of beam quality achievable using Gaussian laser pulses has been performed[5], while the ultimate beam brightness achievable applying RF compression in the SPARC photo-injector, reported in [4], is shown to reach a record value of 1.110 A/(m.rad) , implying a peak current up to 1 kA with a normalized slice transverse emittance (in the central part of the bunch) of 0.5 μm.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Reference installation for the German grid initiative D-Grid

The D-Grid reference installation is a test platform for the German grid initiative. The main task is to create the grid prototype for software and hardware components needed in the D-Grid community. For each grid-related task field different alternative middleware is included. With respect to changing demands from the community, new versions of the reference installation are released every six...

متن کامل

Cost and performance data for residential buildings fitted with GSHP systems in Melbourne Australia

The data reported in this article presents actual installation costs and performance data for a selection of residential Ground Source Heat Pump (GSHP) systems in Melbourne, Australia. The installation cost data includes five main cost components: ground loop installation, head pipe installation, heat pump, mechanical room installation, and fittings. The performance data presented here includes...

متن کامل

ارزیابی تأثیر سطوح مختلف کم‌آبیاری و خشکی موضعی ریشه بر عملکرد و بهره‌وری مصرف آب ذرت دانه‌ای در منطقه حاجی‌آباد

With the increase of population, the optimal use of water resources is necessary. This study was carried out to evaluate the impact of different levels of irrigation on the yield, yield components and water productivity of corn using single and double row drip irrigation systems (Tubes type). . The experiment was conducted in a split plot design based on the randomized complete block design (RC...

متن کامل

Bearing Capacity of Sheet Hanger Connection to the Trapezoidal Metal Sheet

Hanging to the trapezoidal sheet by a very widespread solution used in civil engineering to lead the distribution of energy, sanitary, air distribution system etc. under the roof or floor structure. The trapezoidal decking part of the whole installation system for specific distribution medium. The leading companies offer installation systems for each specific distribution e.g. pipe rings, sprin...

متن کامل

Ineffective Healthcare Technology Management in Benin’s Public Health Sector: The Perceptions of Key Actors and Their Ability to Address the Main Problems

Background Low-income countries face many contextual challenges to manage healthcare technologies effectively, as the majority are imported and resources are constrained to a greater extent. Previous healthcare technology management (HTM) policies in Benin have failed to produce better quality of care for the population and costeffectiveness for the government. This study aims to identify and a...

متن کامل

Deformation mechanism and optimum design for large cross-sectional longwall installation roadway under compound roof

Both the deformation characters and the failure mode of the large cross-sectional longwall installation roadway under compound roof are becoming an emergent issue than ever before due to the rapid development of modern mining equipment. Various engineering applications have revealed that the insufficient design and inappropriate support technology are the main reasons for the fatal accidents as...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005