INTRODUCTION Beijing subway line 14 includes four stations and approximately 2.8 km of tunnels between the Dongfengbeiqiao and Jingshunlu areas of the city. Due to the surface and underground space limitations of this section, a double-track running tunnel instead of two single-track running tunnels was adopted to connect the two stations. The double-track tunnels were excavated by a 10.22 m diameter earth pressure balance (EPB) shield. It was the first time that an EPB shield more than 10 m in diameter was used in Beijing subway construction. CASE DESCRIPTION The shield, which passes underneath densely built-up areas of the city and is equipped with a spoke-type cutterhead, with balance between the ground pressure and the earth chamber pressure at the tunnel face, is of great importance. Referring to experiences gained in the EPB shield tunneling, attention was paid to the function of soil conditioning and simultaneous backfilling grouting of the shield, and some special designs were considered in manufacturing the machine. DISCUSSION AND EVALUATION In addition to the agitating rods welded to the cutterhead, two independently driven agitators were added to fully mix everything in the earth chamber. Independent pipelines were arranged for injecting different conditioning agents. Indoor tests in combination with field tests were conducted to find suitable additives and injection ratios of the additives, and determine the mix ratio of the two-component grout for simultaneous backfilling grouting. A scheme was employed for simultaneously injecting the bentonite slurry at 8% concentration and the foam liquid at 5% concentration to condition the excavated soil. The cement-sodium silicate grout was adopted to fill the tail void and the injection volume per ring was 14.1-15.3 m3. CONCLUSIONS The performance of the shield and evaluation of the corresponding tunneling technologies are introduced in terms of the shield tunneling induced ground surface settlements. The success of the project is of great significance to Beijing subway construction and underground space utilization. The findings serve as a useful reference for similar projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development of the safety control framework for shield tunneling in close proximity to the operational subway tunnels: case studies in mainland China

INTRODUCTION China's largest cities like Beijing and Shanghai have seen a sharp increase in subway network development as a result of the rapid urbanization in the last decade. The cities are still expanding their subway networks now, and many shield tunnels are being or will be constructed in close proximity to the existing operational subway tunnels. The execution plans for the new nearby shi...

متن کامل

Geological Hazards analysis in Urban Tunneling by EPB Machine (Case study: Tehran subway line 7 tunnel)

Technological progress in tunneling has led to modern and efficient tunneling methods in vast underground spaces even under inappropriate geological conditions. Identification and access to appropriate and sufficient geological hazard data are key elements to successful construction of underground structures. Choice of the method, excavation machine, and prediction of suitable solutions to over...

متن کامل

Application of artificial intelligence methods for estimation of maximum surface settlement caused by EPB shield tunneling

Maximum surface settlement (MSS) is an important parameter for the design and operation of earth pressure balance (EPB) shields that should determine before operate tunneling. Artificial intelligence (AI) methods are accepted as a technology that offers an alternative way to tackle highly complex problems that can’t be modeled in mathematics. They can learn from examples and they are able...

متن کامل

Numerical Modelling of Backfill Grouting Approaches in EPB Tunneling

One of the main issues involved during tunnel construction with tunnel boring machines is the tail gap grouting. This gap is between the external diameter of tunnel lining and the excavation boundary that is filled with high-pressure grouting materials. In this work, three different approaches of gap grouting modeling in the FLAC3D software are investigated with a special attention to the...

متن کامل

Role of Soil Plasticity in Evaluating Clay Conditioning for Epb Tunnelling Case Studies of Tunnel Projects with Big Challenges

Role of Soil Plasticity in Evaluating Clay Conditioning for EPB Tunnelling Soil clogging occurred at the early construction stage of Nanchang Metro Line 1, China, when an earth balance pressure (EPB) shield passed through the argillaceous siltstone with a total content of clay minerals of 40.5%. To avoid the reappearance of soil clogging at the later stage, a new scheme was proposed to determin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 5  شماره 

صفحات  -

تاریخ انتشار 2016