Bicriteria robotic cell scheduling

نویسندگان

  • Hakan Gultekin
  • M. Selim Akturk
  • Oya Ekin Karasan
چکیده

This paper considers the scheduling problems arising in twoand three-machine manufacturing cells configured in a flowshop which repeatedly produces one type of product and where transportation of the parts between the machines is performed by a robot. The cycle time of the cell is affected by the robot move sequence as well as the processing times of the parts on the machines. For highly flexible CNC machines, the processing times can be changed by altering the machining conditions at the expense of increasing the manufacturing cost. As a result, we try to find the robot move sequence as well as the processing times of the parts on each machine that not only minimize the cycle time but, for the first time in robotic cell scheduling literature, also minimize the manufacturing cost. For each 1-unit cycle in twoand three-machine cells, we determine the efficient set of processing time vectors such that no other processing time vector gives both a smaller cycle time and a smaller cost value. We also compare these cycles with each other to determine the sufficient conditions under which each of the cycles dominates the rest. Finally, we show how different assumptions on cost structures affect the results.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Solution for the Cyclic Multiple-Part Type Three-Machine Robotic Cell Problem based on the Particle Swarm Meta-heuristic

In this paper, we develop a new mathematical model for a cyclic multiple-part type threemachine robotic cell problem. In this robotic cell a robot is used for material handling. The objective is finding a part sequence to minimize the cycle time (i.e.; maximize the throughput) with assumption of known robot movement. The developed model is based on Petri nets and provides a new method to calcul...

متن کامل

بهینه سازی هزینه کل تولید و زمان در سلول رباتیک سه ماشین

In this research, robotic cell scheduling problem with three CNC machines and with an operation on each machine with the purpose of optimizing manufacturing cost and time in S1 cycle has been investigated. To obtain the optimal total cost of production has been used the optimal processing time on machine operation. In this research, robotic cell scheduling is studied in three different situatio...

متن کامل

The polynomial solvability of selected bicriteria scheduling problems on parallel machines with equal length jobs and release dates

We consider bicriteria scheduling problems involving several classical well-known scheduling objectives on parallel, identical machines with job release dates. The jobs are assumed to have equal processing times. Our bicriteria treatment of these problems includes lexicographic optimization, minimization of a composite linear function, generation of schedules on the efficient frontier and the g...

متن کامل

A two machine bicriteria scheduling problem

In this paper we consider the bicriteria problem of scheduling n jobs on two parallel machines to minimize the primary criterion of maximum tardiness (1 .!9 ) and the secondary criterion of number of tardy jobs (NT). Algorithms are developed to optimize each of these criteria. Some properties on which the 1 .!9 algorithm is based are developed. Computational experience with the algorithms is al...