Portfolio Planning for Planet Earth
نویسنده
چکیده
منابع مشابه
A Model of the Temporal Variability of Optical Light from Extrasolar Terrestrial Planets
The light scattered by an extrasolar Earth-like planet’s surface and atmosphere will vary in intensity and color as the planet rotates; the resulting light curve will contain information about the planet’s properties. Since most of the light comes from a small fraction of the planet’s surface, the temporal flux variability can be quite significant, ∼ 10−100%. In addition, for cloudless Earth-li...
متن کاملEarth Science Applications of Sensor Data
Advances in earth observation technologies have led to the acquisition of vast volumes of accurate, timely and reliable environmental data which encompass a multitude of information about the land, ocean and atmosphere of the planet. Earth science sensor datasets capture multiple facets of information about natural processes and human activities that shape the physical landscape and environment...
متن کاملThe Moon Meets All Requirements of the IAU Definition for “Planet”
The Earth-Moon system has often been characterized as having some characteristics of a “double planet” system. It is demonstrated that while the orbital barycenter of the Earth-Moon pair lies inside the radius of the Earth, the Moon does meet all three requirements of the IAU definition for “planet” and therefore the Moon can correctly be identified as the Solar System’s 9 planet. In order to a...
متن کاملThe Occurrence Rate of Small Planets around Small Stars
We use the optical and near-infrared photometry from the Kepler Input Catalog to provide improved estimates of the stellar characteristics of the smallest stars in the Kepler target list. We find 3897 dwarfs with temperatures below 4000K, including 64 planet candidate host stars orbited by 95 transiting planet candidates. We refit the transit events in the Kepler light curves for these planet c...
متن کاملProject Portfolio Risk Response Selection Using Bayesian Belief Networks
Risk identification, impact assessment, and response planning constitute three building blocks of project risk management. Correspondingly, three types of interactions could be envisioned between risks, between impacts of several risks on a portfolio component, and between several responses. While the interdependency of risks is a well-recognized issue, the other two types of interactions remai...
متن کامل