We study a single-machine scheduling problem in a flexible framework where both job processing times and due dates are decision variables to be determined by the scheduler. The model can also be applied for quoting delivery times when some parts of the jobs may be outsourced. We analyze the problem with common due date assignment and a convex resource consumption function. We provide a bicriteria analysis where the first criterion is to minimize the total weighted number of tardy jobs plus due date assignment cost, and the second criterion is to minimize total weighted resource consumption. We consider four different models for treating the two criteria. Although the problem of minimizing a single integrated objective function can be solved in polynomial time, we prove that the three bicriteria models are NP-hard. We also present special cases which are polynomially solvable and frequently occur in practice.
منابع مشابه
A faster algorithm for a due date assignment problem with tardy jobs
Keywords: Single-machine sequencing Weighted number of tardy jobs Due date assignment a b s t r a c t The single-machine due date assignment problem with the weighted number of tardy jobs objective, (the TWNTD problem), and its generalization with resource allocation decisions and controllable job processing times have been solved in O(n 4) time by formulating and solving a series of assignment...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملA branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem
In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery. jobs have to be scheduled on a single machine and delivered to customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA...
متن کاملBatch Scheduling and Common Due Date Assignment Problem: an NP-hard Case
An important special case of the problem studied in Cheng and Kovalyov (1996) arises when there are equal setup times and equal job processing times. Computational complexity of this case was indicated to be open, however. I prove its NP-hardness. Cheng and Kovalyov [l] introduced the following due date assignment and scheduling problem. There are n groups of jobs to be scheduled for processing...
متن کاملA Survey of Single Machine Scheduling to Minimize Weighted Number of Tardy Jobs
This paper presents a review of single machine scheduling to minimize the weighted number of tardy jobs. The problem involves processing n jobs on a single machine, each having processing time pj and due date dj . The aim is to schedule the jobs to meet their due date. A job is tardy if the completion time of job j is Cj > dj and on-time otherwise. This paper assesses works done to minimize the...