A combined approach for equipment selection: F-PROMETHEE method and zero-one goal programming

نویسندگان

  • Burcu Yilmaz
  • Metin Dagdeviren
چکیده

0957-4174/$ see front matter 2011 Elsevier Ltd. A doi:10.1016/j.eswa.2011.03.043 ⇑ Corresponding author. Tel.: +90 3125823803; fax E-mail address: [email protected] (B. Yilma With the labor and material, equipments will be used in production processes, are one of the essential components of the production systems. Equipments used in production process are an important subject, effecting the system efficiency, the labor effectiveness and the product quality, and using inappropriate equipment effects all of this issues negatively. Equipment selection is a very important point for an efficient production system and is a complex and exhaustive problem necessitating the most proper selection among the various types of equipments seeming almost identical, generally. Therefore, an equipment selection problem is a multi-criteria decision making problem entailing taking into account of several criteria and generally involving linguistic datas. In this study, a multi-criteria decision making problem compromising a ranking due to criterias expressed in a linguistic way, concerning a welding machine selection problem of a company is handled. The vagueness of the linguistic terms in the evaluation process required employment of fuzzy numbers and accordingly the fuzzy version of PROMETHEE method, which is a multi-criteria ranking technique, is applied to the selection problem. The information obtained from F-PROMETHEE results is then used as a constraint in formulating a zero–one goal programming model. We demonstrated how a combined F-PROMETHEE and ZOGP model can be used for a real world application problem as an aid for equipment selection. 2011 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Combined group EA-PROMETHEE method for a supplier selection problem

One of the important decisions which impacts all firms’ activities is the supplier selection problem. Since the 1950s, several works have addressed this problem by treating different aspects and instances. In this paper, a combined multiple criteria decision making (MCDM) technique (EA-PROMETHEE) has been applied to implement a proper decision making. To this aim, after reviewing the theoretica...

متن کامل

Optimum Maintenance Strategy Selection using a Hybrid Approach based on Analytical Hierarchy Process and Revised Multi Choice Goal Programming

This study aims to select optimal maintenance strategy for components of an electric motor of the National Iranian Oil Refining and Distribution Company. In this regard, a method based on revised multi choice goal programming and analytic hierarchy process (AHP) is presented. Since improving the equipment reliability is an important issue, reliability centered maintenance (RCM) strategies are i...

متن کامل

A Comprehensive Model for R and D Project Portfolio Selection with Zero-One Linear Goal-Programming (RESEARCH NOTE)

Technology centered organizations must be able to identify promising new products or process improvements at an early stage so that the necessary resources can be allocated to those activities. It is essential to invest in targeted research and development (R and D) projects as opposed to a wide range of ideas so that resources can be focused on successful outcomes. The selection of the most ap...

متن کامل

Using Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects

Multi attribute decision making methods are considered as one of the most useful methods for solving ranking problems. In some decision making problems, while the alternatives for corresponding criteria are compared in a pairwise comparison manner, if the criteria are inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. In this researc...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Expert Syst. Appl.

دوره 38  شماره 

صفحات  -

تاریخ انتشار 2011