A Heuristic to Minimize Makespan in Proportional Parallel Flow Shops
نویسنده
چکیده
This paper addresses the problem of minimizing the makespan on a two-stage parallel flow shops with proportional processing times. The problem of scheduling n independent jobs on m proportional parallel flow shops to minimize makespan is known to be NP-hard and hence too difficult to solve in polynomial time. A multiphase heuristic algorithm to minimize the makespan on two proportional parallel flow shops is proposed. A simulation study is conducted to examine the effectiveness of the proposed heuristic algorithm for small and large problems. The results and analysis of quite extensive computational experiments for small size problems show that the proposed algorithm can yield solutions within a few percent of optimal solutions. The computational results for large size problems show that the performance of the proposed algorithm is relatively more effective than the existing SKV algorithm.
منابع مشابه
Heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...
متن کاملAn Effective Hybrid Genetic Algorithm for Hybrid Flow Shops with Sequence Dependent Setup Times and Processor Blocking
Hybrid flow-shop or flexible flow shop problems have remained subject of intensive research over several years. Hybrid flow-shop problems overcome one of the limitations of the classical flow-shop model by allowing parallel processors at each stage of task processing. In many papers the assumptions are generally made that there is unlimited storage available between stages and the setup times a...
متن کاملMeta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times
This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...
متن کاملApproximation algorithms for the parallel flow shop problem
We consider the NP-hard problem of scheduling n jobs in m two-stage parallel flow shops so as to minimize the makespan. This problem decomposes into two subproblems: assigning the jobs to parallel flow shops; and scheduling the jobs assigned to the same flow shop by use of Johnson’s rule. For m = 2, we present a 32 -approximation algorithm, and for m = 3, we present a 12 7 -approximation algori...
متن کاملMinimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop
[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...
متن کامل