Scheduling with Fuzzy Methods

نویسنده

  • Wolfgang Eiden
چکیده

Nowadays, manufacturing industries { driven by erce competition and rising customer requirements { are forced to produce a broader range of individual products of rising quality at the same (or preferably lower) cost. Meeting these demands implies an even more complex production process and thus also an appropriately increasing request to its scheduling. Aggravatingly, vagueness of scheduling parameters { such as times and conditions { are often inherent in the production process. In addition, the search for an optimal schedule normally leads to very di cult problems (NP-hard problems in the complexity theoretical sense), which cannot be solved e ciently. With the intent to minimize these problems, the introduced heuristic method combines standard scheduling methods with fuzzy methods to get a nearly optimal schedule within an appropriate time considering vagueness adequately.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

متن کامل

ارائه یک سیستم کنترل فازی برای تخمین زمان ختم پروژه در شبکه‌های گرت

Project scheduling is one of the main fundamentals in project management so the related progressive methods which consider most of the project limitations would be valuable. The GERT (Graphical Evaluation and Review Technique) is a network analysis method which has unique capabilities in comparison with other conventional scheduling methods. On the other hand and, there is no definite conformit...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics

This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...

متن کامل

Integrated capacitated transportation and production scheduling problem in a fuzzy environment

Nowadays, several methods in production management mainly focus on the different partners of supply chain management. In real world, the capacity of planes is limited. In addition, the recent decade has seen the rapid development of controlling the uncertainty in the production scheduling configurations along with proposing novel solution approaches. This paper proposes a new mathematical model...

متن کامل

A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times

This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004