Incorporation of ore grade uncertainty into the push back design process

نویسندگان

  • J. Gholamnejad
  • M. Osanloo
چکیده

Long-term production planning design is a major step in mine planning, because it determines the economic outcome of a project. Also long-term planes act as a guide for medium and short-term production scheduling. Because there are a large number of blocks within the ultimate pit limit, the pit can be divided into a series of sub-pits commonly called push backs, cut backs or phases. These push backs are designed with haul road access and act as a guide during the yearly scheduling process. Therefore, pushback design plays a key role in defining annual cash flows to be generated from a mining operation. There may be many alternative push back sequences for an open pit, which can result in obtaining different NPV from a mining project. Since the 1960s many push back design algorithms have been developed. Two strategies were followed through the previous push back design algorithms: 1. Determining the push backs with the assumption that the best ore is the ore that has the highest grade and needs to have a very low stripping ratio to be extracted. Economic parameterization methods are classified in this group. In these methods a series of pits are generated by applying the ultimate pit limit algorithms (Learchs and Grossman’s algorithm1,2 and network flow one3) on different economic block models of the deposit. These economic models can be generated by changing some economic parameters such as commodity price, cut-off grade or mining and processing costs. The most widely used algorithm in this regard is Whittle’s method4,5. Wang and Sevim6 proposed a push back design algorithm using reserve parameterization instead of economic parameterization. Their algorithm was based on obtaining maximum metal pit containing M blocks through M+N blocks in the model. In 1986 a heuristic approach was formulated by Gershon7 which considers the quality of the ore, the position of the ore block and the quality of the blocks under the desired ore block. Experience showed that defining the best ore as above may not lead to maximizing the Incorporation of ore grade uncertainty into the push back design process

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Push Back Design in Two-element Deposits Incorporating Grade Uncertainty (RESEARCH NOTE)

Push back design as a complex task, is one of the major steps in the open pit mines planning. Push backs can be generated by varying economic factors such as commodity price, mining cost, processing cost, etc. Another important issue in generating push backs is grade uncertainty, which can cause the problem be more complex. Conventional methods of push back design ignore grade uncertainty. To o...

متن کامل

Analyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran

Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...

متن کامل

Application of Sequential Gaussian Conditional Simulation to Underground Mine Design Under Grade Uncertainty

In mining projects, all uncertainties associated with a project must be considered to determine the feasibility study. Grade uncertainty is one of the major components of technical uncertainty that affects the variability of the project. Geostatistical simulation, as a reliable approach, is the most widely used method to quantify risk analysis to overcome the drawbacks of the estimation methods...

متن کامل

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

Beneficiation of a low-grade iron ore by combination of wet low-intensity magnetic separation and reverse flotation methods

Beneficiation of a low-grade iron ore was investigated by combination of the low-intensity magnetic separation and reverse flotation methods. The main constituents of the representative sample were 36.86% Fe, 8.1% FeO, 14.2% CaO, 13.6% SiO2, and 0.12% S based on the X-ray fluorescence, titration, and Leco analysis methods. The mineralogical studies by the X-ray diffraction, scanning electron mi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -