Case Studies of Using Flowline for Production Planning and Control

نویسندگان

  • Russell Kenley
  • Olli Seppänen
چکیده

Flowline, or Line-of-Balance, has recently gained attention in Lean Construction literature because of its capacity for facilitating control of production flow and planning of continuous work. In the broader technical literature, previous work has concentrated on the analytic properties of flowline, such as learning curves, and is generally silent on how the method should be used to improve productivity. This is because internationally the technique has received relatively little application. However, in Finland, flowline has been used as the principal scheduling method since 1980s. This paper takes a practical approach and describes the use of flowline based planning and control in two real case projects. One of the projects is a large residential construction project in Sydney, Australia. The other project is a Finnish retail park construction project. These pilot projects were done at the same time and the projects were able to learn from the experiences of the other. The cases highlight the differences between the Finnish way of planning a schedule with buffers between activities with synchronized production rates and the Australian way of driving a schedule with a tightly constrained CPM schedule. A methodology using flowline as a visual planning tool but using familiar CPM logic as the underlying engine was appropriate in the Australian case. In this methodology the objective is to improve site control by including information about location and to be able to plan continuous work for subcontractors and to visualize the effects of planning decisions. The result is much clearer communication to the trade contractors about the timing and location of their work, improved control systems and better work flow. The Finnish project team was already familiar with the basic use of flowline so the more advanced risk management based approach was used. The risk management based approach includes using quantities estimated by location as the starting point and optimizes the crews so that the risk of schedule disturbances is minimized. The planning happens on two levels: the master schedule has less detail and the task plans are detailed plans of individual tasks which are done by persons responsible for the work when all the necessary information about implementation is available. The results from the Finnish case include a methodology for effectively controlling production flow and how to include the subcontractors in the process.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Novel Integrated Approach to Oil Production Optimization and Limiting the Water Cut Using Intelligent Well Concept: Using Case Studies

Intelligent well technology has provided facility for real time production control through use of subsurface instrumentation. Early detection of water production allows for a prompt remedial action. Effective water control requires the appropriate performance of individual devices in wells on maintaining the equilibrium between water and oil production over the entire field life. However, there...

متن کامل

An application of principal component analysis and logistic regression to facilitate production scheduling decision support system: an automotive industry case

Production planning and control (PPC) systems have to deal with rising complexity and dynamics. The complexity of planning tasks is due to some existing multiple variables and dynamic factors derived from uncertainties surrounding the PPC. Although literatures on exact scheduling algorithms, simulation approaches, and heuristic methods are extensive in production planning, they seem to be ineff...

متن کامل

Strategic Planning for Agriculture Section Using SWOT, QSPM and Blue Ocean- Case Study: Eshraq Agro-industry Company

Strategic management is defined as a set of management decisions and actions that determine a company's long-term performance and lead and control the organization so that it can quickly respond to some internal and external environmental changes. Obviously, the agricultural sector and natural resources are one of the most significant economic sectors of the country because of their vital role ...

متن کامل

Healing and Modular Healthcare Facilities View project

Performance measurement is an important component of lean-based management systems, however cost management systems or analysis have largely been applied at a high level and have not attempted to measure or model the production cost impacts of disruption on a lean project. While it is important to develop systems for practical site management, it is equally important to ensure that such systems...

متن کامل

A LINEAR PROGRAMMING MODEL FOR PRODUCTION PLANNING: AN IRANIAN CASE STUDY IN CEMENT

Production planning and inventory control efforts are known as the driving engines of manufacturing systems. The manufacturers, competing to survive in these days’ competitive business environment, aim to satisfy customers’ needs. This requires a precise production plan throughout the supply chain. These days, because of the increasing costs of production and distribution, especially in the cem...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017