Solving a concrete sleepers production scheduling by genetic algorithms
نویسندگان
چکیده
PRECON S.A. is a manufacturing company devoted to produce prefabricated concrete parts for several industries as railway transportation and agricultural industries. Recently, PRECON S.A. signed a contract with RENFE, the Spanish National Railway Company, to manufacture pre-stressed concrete sleepers for the sidings of the new railways of the high speed train (AVE). The scheduling problem associated with the manufacturing process of the sleepers is very complex, since this involves several constraints and objectives. These constraints are related to production capacity, the quantity of available moulds, demand satisfaction and other operational constraints. The two main objectives are related to the way to maximize the utilization of manufacturing resources and minimize mould movements. We developed a deterministic crowding genetic algorithm for this multiobjective problem. The algorithm has proved to be a powerful and flexible tool to solve large-scale instances of this real and complex scheduling problem. 2005 Elsevier B.V. All rights reserved.
منابع مشابه
Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملConsolidated Technique of Response Surface Methodology and Data Envelopment Analysis for setting the parameters of meta-heuristic algorithms - Case study: Production Scheduling Problem
In this study, given the sequence dependent setup times, we attempt using the technique of Response Surface Methodology (RSM) to set the parameters of the genetic algorithm (GA), which is used to optimize the scheduling problem of n job on 1 machine (n/1). It aims at finding the most suitable parameters for increasing the efficiency of the proposed algorithm. At first, a central composite d...
متن کاملModelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines
This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 179 شماره
صفحات -
تاریخ انتشار 2007