Producer–retailer integrated EMQ system with machine breakdown, rework failures, and a discontinuous inventory issuing policy

نویسندگان

  • Singa Wang Chiu
  • Shin-Wei Chen
  • Yuan-Shyi Peter Chiu
  • Ting-Wei Li
چکیده

This study develops two extended economic manufacturing quantity (EMQ)-based models with a discontinuous product issuing policy, random machine breakdown, and rework failures. Various real conditions in production processes, end-product delivery, and intra-supply chains such as a producer-retailer integrated scheme are examined. The first model incorporates a discontinuous multi-delivery policy into a prior work (Chiu et al. in Proc Inst Mech Eng B J Eng 223:183-194, 2009) in lieu of their continuous policy. Such an enhanced model can address situations in supply chain environments, where finished products are transported to outside retail stores (or customers). The second model further combines retailer's stock holding costs into the first model. This extended EMQ model is applicable in situations in present-day manufacturing firms where finished products are distributed to company's own retail stores (or regional sales offices) and stocked there for sale. Two aforementioned extended EMQ models are investigated, respectively. Mathematical modeling along with iterative algorithms are employed to derive the optimal production run times that minimize the expected total system costs, including the costs incurred in production units, transportation, and retail stores, for these integrated EMQ systems. Numerical examples are provided to demonstrate the practical application of the research results.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Producer′s Replenishment Policy for an EPQ Model with Rework and Machine Failure Taking Place in Backorder Reloading Time

This paper studies the optimal producer′s replenishment policy for an economic production quantity (EPQ) model with rework and breakdown taking place in backorder replenishing time. A recent published article has studied the lot-sizing problem on an imperfect quality EPQ model. However, another reliability factor random machine breakdown is inevitable in most real-life production systems. To de...

متن کامل

An EPQ model with a random breakdown, rework, and a discontinuous issuing policy

This study attempts to determine the optimal production run time for an economic production quantity (EPQ) model with a Poisson breakdown rate, the rework of nonconforming items, and multi-delivery of finished products. It is assumed that nonconforming items can be randomly produced and repaired through a rework process added at the end of the production process. Production equipment is subject...

متن کامل

Integrated inventory model with multi-retailer and rework process

This paper derives optimal production-shipment policy for a single-producer multi-retailer integrated inventory model with rework. We assume that a product is manufactured by a producer. All items are screened for quality assurance. Random defective items will be picked up and reworked in the same cycle when regular production ends. Upon entire lot is quality assured, multiple shipments are del...

متن کامل

Mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework

This study uses mathematical modeling to examine a multi-product economic manufacturing quantity (EMQ) model with an enhanced end items issuing policy and rework failures. We assume that a multi-product EMQ model randomly generates nonconforming items. All of the defective are reworked, but a certain portion fails and becomes scraps. When rework process ends and the entire lot of each product i...

متن کامل

Optimal Run Time for EMQ Model with Backordering, Failure-In- Rework and Breakdown Happening in Stock-Piling Time

This study examines the optimal run time for the economic manufacturing quantity (EMQ) model with failure-in-work, backlogging, and random breakdown happening in stock-piling time. A recent article by Chiu and Chiu [Mathematical modeling for production system with backlogging and failure in repair, Journal of Scientific & Industrial Research, 65 (2006) 499-506] investigated optimal lot-size for...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره 5  شماره 

صفحات  -

تاریخ انتشار 2016