A model for preemptive maintenance of medical linear accelerators—predictive maintenance
نویسندگان
چکیده
BACKGROUND Unscheduled accelerator downtime can negatively impact the quality of life of patients during their struggle against cancer. Currently digital data accumulated in the accelerator system is not being exploited in a systematic manner to assist in more efficient deployment of service engineering resources. The purpose of this study is to develop an effective process for detecting unexpected deviations in accelerator system operating parameters and/or performance that predicts component failure or system dysfunction and allows maintenance to be performed prior to the actuation of interlocks. METHODS The proposed predictive maintenance (PdM) model is as follows: 1) deliver a daily quality assurance (QA) treatment; 2) automatically transfer and interrogate the resulting log files; 3) once baselines are established, subject daily operating and performance values to statistical process control (SPC) analysis; 4) determine if any alarms have been triggered; and 5) alert facility and system service engineers. A robust volumetric modulated arc QA treatment is delivered to establish mean operating values and perform continuous sampling and monitoring using SPC methodology. Chart limits are calculated using a hybrid technique that includes the use of the standard SPC 3σ limits and an empirical factor based on the parameter/system specification. RESULTS There are 7 accelerators currently under active surveillance. Currently 45 parameters plus each MLC leaf (120) are analyzed using Individual and Moving Range (I/MR) charts. The initial warning and alarm rule is as follows: warning (2 out of 3 consecutive values ≥ 2σ hybrid) and alarm (2 out of 3 consecutive values or 3 out of 5 consecutive values ≥ 3σ hybrid). A customized graphical user interface provides a means to review the SPC charts for each parameter and a visual color code to alert the reviewer of parameter status. Forty-five synthetic errors/changes were introduced to test the effectiveness of our initial chart limits. Forty-three of the forty-five errors (95.6 %) were detected in either the I or MR chart for each of the subsystems monitored. CONCLUSION Our PdM model shows promise in providing a means for reducing unscheduled downtime. Long term monitoring will be required to establish the effectiveness of the model.
منابع مشابه
Integrated Preventive and Predictive Maintenance Markov Model for Circuit Breakers Equipped With Condition Monitoring
The Circuit Breaker (CB) is one of the most important equipment in power systems. CB must operate reliably to protect power systems as well as to perform tasks such as load disconnection, normal interruption, and fault current interruption. Therefore, the reliable operation of CB can affect the security and stability of power network. In this paper, effects of Condition Monitoring (CM) of CB on...
متن کاملA Practical Self-Assessment Framework for Evaluation of Maintenance Management System based on RAMS Model and Maintenance Standards
A set of technical, administrative and management activities are done in the life cycle of equipment, to be located in good condition and have proper and expected functioning. This is refers to be, maintenance management system (MMS). The framework and models of assessment in order to enhance effectiveness of a MMS could be proposed in two categories: qualitative and quantitative. In this resea...
متن کاملبرنامهریزی تعمیرات و نگهداری پیشگویانه ایستگاههای گاز با رویکرد ترکیبی PCA و شبکههای عصبی فازی
With the emergence of predictive maintenance in 1980, radical changes took place in maintenance planning. Predictive maintenance depends on the prediction of facilities failure which are used at present. By predicting the failures correctly in future, we can decrease the cost of maintenance to a great extent. This approach involves using multiple techniques including artificial intelligence, ...
متن کامل[Evaluation of a risk communication approach for maintenance staff working with induced radioactivity in medical linear accelerators].
In order to promote consensus building on decommissioning operation rules for medical linear accelerators in Japan, we carried out a risk communication (RC) approach mainly providing knowledge for maintenance staff regarding induced radioactivity. In February 2012, we created a booklet (26 pages) to present an overview of the amended law, the mechanism and the distribution of induced radioactiv...
متن کاملAvailability analysis of mechanical systems with condition-based maintenance using semi-Markov and evaluation of optimal condition monitoring interval
Maintenance helps to extend equipment life by improving its condition and avoiding catastrophic failures. Appropriate model or mechanism is, thus, needed to quantify system availability vis-a-vis a given maintenance strategy, which will assist in decision-making for optimal utilization of maintenance resources. This paper deals with semi-Markov process (SMP) modeling for steady state availabili...
متن کامل