Start Finish
نویسنده
چکیده
Many real-world planning problems require generating plans that maximize the parallelism inherent in a problem. There are a number of partial-order planners that generate such plans; however, in most of these planners it is unclear under what conditions the resulting plans will be correct and whether the planner can even nd a plan if one exists. This paper identiies the underlying assumptions about when a partial plan can be executed in parallel, deenes the classes of parallel plans that can be generated by diierent partial-order planners, and describes the changes required to turn ucpop into a parallel execution planner. In addition , we describe how this planner can be applied to the problem of query access planning, where parallel execution produces substantial reductions in overall execution time.
منابع مشابه
Predictability of Least Laxity First Scheduling Algorithm on Multiprocessor Real-Time Systems
A priority-driven scheduling algorithm is said to be start time (finish time) predictable if the start time (finish time) of jobs in the schedule where each job executes for its actual execution time is bounded by the start times (finish times) of jobs in the schedules where each job executes for its maximum/minimum execution time. In this paper, we study the predictability of a job-level dynam...
متن کاملUniaxial Transformation Behavior in Tension and Compression in an Fe-Based Shape Memory Alloy : Transformation Lines and Thermomechanical Hystereses
The uniaxial thermomechanical behavior of a polycrystalline Fe-9%Cr-5%Ni-14%Mn-6%Si (all wt.%) shape memory alloy is investigated for both tensile and compressive stress states. The martensite start stresses measured upon tension and compression loading of austenite depend linearly on temperature, thus forming straight lines in the stress-temperature regime. The lines belonging to tension and c...
متن کاملThe effect of deep cryogenic treatment on mechanical properties of 80CrMo12 5 tool steel
Cryogenic treatment can be used as a supplemental treatment that is performed on some tool steels between quenching and tempering as an effective method for decreasing retained austenite and increasing wear resistance. In this research, the effect of deep cryogenic treatment (DCT) on dimensional stability and mechanical properties of 80CrMo12 5 tool steel was investigated. The martensitic trans...
متن کاملPacing strategy in male elite and age group 100 km ultra-marathoners
Pacing strategy has been investigated in elite 100 km and elite 161 km (100 mile) ultra-marathoners, but not in age group ultra-marathoners. This study investigated changes in running speed over segments in male elite and age group 100 km ultra-marathoners with the assumption that running speed would decrease over segments with increasing age of the athlete. Running speed during segments in mal...
متن کاملTropical optimization problems in project scheduling
We consider a project that consists of activities operating in parallel under various temporal constraints, including start-start, startfinish and finish-start precedence relations, early start, late start and late finish time boundaries, and due dates. Scheduling problems are formulated to find optimal schedules for the project under different optimality criteria to minimize, including the pro...
متن کاملCriticality of Schedule Constraints – Classification and Identification
In construction scheduling, constraints among activities are vital as they govern the schedule solution. Understanding their criticality is essential for better schedule management. This paper presents a systematic method to identify and classify the criticality of schedule constraints for the schedule management from the constraint perspective. In terms of criticality, schedule constraints can...
متن کامل