We introduce the Linear Resource Temporal Network (LRTN), which consists of activities that consume or produce a resource, subject to absolute and relative metric temporal constraints; production and consumption is restricted to linear functions of activity duration. We show how to construct tight bounds for resource availability as a function of time in LRTNs; for a broad class of problems, the complexity is polynomial time in the time horizon h and the number of activities n. Our approach extends a maximum flow formulation previously used to construct tight bounds for networks of events with instantaneous resource impact. We construct the bounds in two parts: we make direct use of maximum flows to find local maxima of the upper bound (and symmetrically local minima of the lower bound), and we solve a related linear programming problem to find local minima of the upper bound (and symmetrically local maxima of the lower bound).
منابع مشابه
Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملAn Exact Algorithm for the Mode Identity Project Scheduling Problem
In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...
متن کاملParticle-size fractions-dependent extracellular enzyme activity in sediments and implications for resource allocation in a subtropical mangrove ecosystem
The distribution of extracellular enzyme activities in particle-size fractions of sediments was investigated in a subtropical mangrove ecosystem. Five enzymes involved in carbon (C), nitrogen (N), and phosphorus (P) cycling were analyzed in the sand, silt, and clay of sediments. Among these fractions, the highest activities of phenol oxidase (PHO), β-D glucosidase (GLU), and N-acetyl-glucosimin...
متن کاملThe optimal energy carriers substitutes in thermal power plants:A fuzzy linear programming model
In this paper, a dynamic optimization approach for optimal choice of energy carriers in thermal power plants is proposed that analyzes the substitution of energy carriers in short-term planning of a power plant.The model is based on the linear programming method with the objective of minimizing costs under constraints of resource availability, energy balances, environmental regulations and elec...
متن کاملModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...