Improving the preemptive bound for the one-machine dynamic total completion time scheduling problem
نویسندگان
چکیده
We consider the single machine dynamic total completion time scheduling problem. This problem is known to be NP-hard in the strong sense. The currently best available lower bound for the problem is known to be the optimal solution value of the corresponding preemptive problem which can be computed in O(n logn) time. We propose an improvement on this bound by exploiting the properties of the preemptive solution. The proposed improvement reduces by 40% on the average the gap between the preemptive solution value and the optimal solution value.
منابع مشابه
A New Branch-and-Bound for the Problem of Mean Completion Time for the Single Machine with Release Time
Preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. In this paper, the same problem has been considered in which objective is to minimize the mean flow time. To prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. O...
متن کاملInvestigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices
In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional ...
متن کاملMinimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...
متن کاملA branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem
In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery. jobs have to be scheduled on a single machine and delivered to customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA...
متن کاملOptimality of the flexible job shop scheduling system based on Gravitational Search Algorithm
The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Oper. Res. Lett.
دوره 31 شماره
صفحات -
تاریخ انتشار 2003