Next Linear Collider Test Accelerator Injector Upgrade
نویسندگان
چکیده
منابع مشابه
The Wire Scanner at Bepcii
To monitor the beam profile in injector of BEPCII which is the upgrade project of Beijing Electron Positron Collider (BEPC). Several beam diagnostic and monitoring instruments are used. Wire scanner as a new diagnostic instrument was designed and manufactured to measure the beam profile at the end of linac in 2007.During the shutdown period of BEPCII we had installed the system at the end of li...
متن کاملPreconceptual Design of an Injector for an Nlc Engineering Test Facility
The preconceptual design of an S-band photo-injector system for a Next Linear Collider (NLC) Engineering Test Facility (ETF) at Fermi National Accelerator Laboratory (FNAL) has been completed. A photocathode gun will deliver a range of bunch charges up to 4 nC at around 190 MeV. The projected performance is 2.5 π mm-mrad rms normalized transverse emittance at 1 nC and 6.7 π mm-mrad at 3.6 nC bu...
متن کاملTest Facilities for Future Linear Colliders
For many years now there has been active research around the world towards a future linear collider with an energy of about 1 TeV. This research has led to several test facilities around the world that seek to test key aspects of the various approaches. A comparison of the approaches to the design is given in these proceedings [1]. The purpose of this paper is to review the status of the test f...
متن کاملThe next Linear Collider Test Accelerator: Status and Results
At SLAC, we are pursuing the design of a Next Linear Collider (NLC) which would begin with a center-of-mass energy of 0.5 TeV, and would be upgradable to 1.0 TeV and beyond [1]. To achieve this high energy, for the past several years we have been working on the development of a high-gradient 11.4-GHz (X-band) linear accelerator for the main linac of the collider. In this paper, we present the s...
متن کاملLhc Luminosity and Energy Upgrade*
LHC upgrade studies are ongoing as part of the EU CARE-HHH and of the US-LARP programmes. The aim is a ten-fold increase of the LHC luminosity by the middle of next decade, a possible upgrade of the injector complex to inject at 1 TeV and, at a later stage, to raise the collider energy. The motivations for the LHC upgrade are discussed. An overview of beam dynamics and technological challenges ...
متن کامل