Of the Event Ipsp 2014 Industrial Problem Solving with Physics

نویسندگان

  • Matteo Franchi
  • Davide Gandolfi
  • Luca Matteo Martini
چکیده

Adige S.p.A. is a world leader company in projecting, producing and selling lasertube cutting systems. Two different systems are available, one based on fusion and the other on oxidation of the material that has to be cut. Both these techniques require the presence of a laser beam well focalised on the material and an assistance gas stream, used to eject the melted material. Until now paths for gas injection and in particular nozzles are drawn using empirical criteria, based on cutting tests. The idea of this work is to find some experimental techniques able to correlate the design of the gas path to the process performance. In addition to this, experimental measurements will be useful to validate numerical simulations of the process. The idea is trying to design and validate an experimental apparatus able to measure the pressure (or the velocity) of the gas during its path across the machine, both inside and outside the nozzle.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

Three Metaheuristic Algorithms for Solving the Multi-item Capacitated Lot-sizing Problem with Product Returns and Remanufacturing

This paper proposes a new mixed integer programming model for multi-item capacitated lot-sizing problem with setup times, safety stock and demand shortages in closed-loop supply chains. The returned products from customers can either be disposed or be remanufactured to be sold as new ones again. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA) al...

متن کامل

Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs

Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...

متن کامل

A Comparison of NSGA II and MOSA for Solving Multi-depots Time-dependent Vehicle Routing Problem with Heterogeneous Fleet

Time-dependent Vehicle Routing Problem is one of the most applicable but least-studied variants of routing and scheduling problems. In this paper, a novel mathematical formulation of time-dependent vehicle routing problems with heterogeneous fleet, hard time widows and multiple depots, is proposed. To deal with the traffic congestions, we also considered that the vehicles are not forced to come...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015