Constrained MaxLik reconstruction of multimode photon distributions

نویسنده

  • F. Piacentini
چکیده

We address the reconstruction of the full photon distribution of multimode fields generated by seeded parametric down-conversion (PDC). Our scheme is based on on/off avalanche photodetection assisted by maximum-likelihood (MaxLik) estimation and does not involve photon counting. We present a novel constrained MaxLik method that incorporates the request of finite energy to improve the rate of convergence and, in turn, the overall accuracy of the reconstruction.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Photon number statistics of multimode parametric down-conversion.

We experimentally analyze the complete photon number statistics of parametric down-conversion and ascertain the influence of multimode effects. Our results clearly reveal a difference between single-mode theoretical description and the measured distributions. Further investigations assure the applicability of loss-tolerant photon number reconstruction and prove strict photon number correlation ...

متن کامل

Software for Complete Mode Structure Analysis of a Light Field

We present a software package aimed at simulating photon-number probability distributions of a range of classical and non-classical states of light. This software can generate arbitrary probability distributions from user-defined mode structure of a light field. It can also solve the reverse problem, i.e., reconstructing the mode structure of a light field from a given probability distribution....

متن کامل

Iterative maximum-likelihood reconstruction in quantum homodyne tomography

I propose an iterative expectation maximization algorithm for reconstructing a quantum optical ensemble from a set of balanced homodyne measurements performed on an optical state. The algorithm applies directly to the acquired data, bypassing the intermediate step of calculating marginal distributions. The advantages of the new method are made manifest by comparing it with the traditional inver...

متن کامل

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008