Optimized Open Pit Mine Design, Pushbacks and the Gap Problem—A Review
نویسندگان
چکیده
Existing methods of pushback (phase) design are reviewed in the context of “gap” problems, a term used to describe inconsistent sizes between successive pushbacks. Such gap problems lead to suboptimal open pit mining designs in terms of maximizing net present value. Methods such as the Lerchs– Grossman algorithm, network flow techniques, the fundamental tree algorithm, and Seymour’s parameterized pit algorithm are examined to see how they can be used to produce pushback designs and how they address gap issues. Areas of current and future research on producing pushbacks with a constrained size to help eliminate gap problems are discussed. A framework for incorporating discounting at the time of pushback design is proposed, which can lead to mine designs with increased NPV.
منابع مشابه
A practical approach to open-pit mine planning under price uncertainty using information gap decision theory
In the context of open-pit mine planning, uncertainties including commodity price would significantly affect the technical and financial aspects of mining projects. A mine planning that takes place regardless of the uncertainty in price just develops an optimized plan at the starting time of the mining operation. Given the price change over the life of mine, which is quite certain, optimality o...
متن کاملORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming
Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...
متن کاملA Two-Phase Simulation-Based Optimization of Hauling System in Open-Pit Mine
One of the key issues in mining is the hauling system. Truck and shovels are the most widely used transportation equipment in mines. In this paper, a two-phase simulation-based optimization is presented to maximize utilization of hauling system in the largest Iranian open-pit copper mine. In the first phase, The OptQuest for Arena software package was used to solve the optimization problem to p...
متن کاملAn imperialist competitive algorithm for solving the production scheduling problem in open pit mine
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
متن کاملA genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کامل