Six decades – and six different roles for the industrial
نویسنده
چکیده
In Finland the role of the industrial designer has changed with time. When the professional practice of industrial design first started to form, the designer was a creator whose work was likened to that of the artist. In the sixties designers started to work in closer cooperation with the industry, and the designer became a member of a team together with the engineer and the marketing representatives. In the seventies ergonomics were largely discussed and in the eighties the issue of Design Management became popular. In the nineties brand building and strategic design became the focus areas, and in the new millennium design was seen as a means of innovation.
منابع مشابه
A New Fuzzy Method for Assessing Six Sigma Measures
Six-Sigma has some measures which measure performance characteristics related to a process. In most of the traditional methods, exact estimation is used to assess these measures and to utilize them in practice. In this paper, to estimate some of these measures, including Defects per Million Opportunities (DPMO), Defects per Opportunity (DPO), Defects per unit (DPU) and Yield, a new algorithm ba...
متن کاملSix Sigma: literature review and implications for future research
There has been considerable number of papers published related to Six Sigma applications in manufacturing and service organizations. However, very few studies are done on reviewing the literature of Six Sigma in all the areas including manufacturing, construction, education, financial service, BPOs and healthcare etc. Considering the contribution of Six Sigma in recent time, a more comprehens...
متن کاملRTY-Based Model for Organizational Performance Measurement
Six sigma, Rolled throughput yield, Organizational performance Six Sigma is a well- established approach to improve the capability of business processes in order to gain satisfaction of customers. The performance assessment of a given process is essential to some phases of six sigma methodology. So far, different indicators are used to demonstrate the performance of a process, while many ...
متن کاملMinimizing the energy consumption and the total weighted tardiness for the flexible flowshop using NSGA-II and NRGA
This paper presents a bi-objective MIP model for the flexible flow shop scheduling problem (FFSP) in which the total weighted tardiness and the energy consumption are minimized simultaneously. In addition to considering unrelated machines at each stage, the set-up times are supposed to be sequence- and machine-dependent, and it is assumed that jobs have different release tim...
متن کاملMapping SAP-Six Sigma Resources to Agile Management Processes
Enterprise Resource Planning (ERP) has become the most strategic tool for an organization to employ. A leading ERP solution is SAP®. It has been employed by organizations to enable them to collaborate on different projects and to integrate all aspects of operations. Just as organizations have adopted ERP solutions, they employed quality initiatives that are designed to help organizations ma...
متن کامل