Commissioning Considerations for BERLinPro

نویسندگان

  • M. McAteer
  • M. Abo-Bakr
  • T. Kamps
  • G. Klemz
  • J. Kuszynski
چکیده

bERLinPro is an energy recovery linac project whose goal is to establish the accelerator physics knowledge and technology needed to produce 50 MeV beams with high current, low normalized emittance, and low losses. The machine will be commissioned in phases beginning in 2018, and extensive planning is underway for start-up of the machine and to prepare for measurements to verify the achievement of target beam parameters. This paper outlines the planned phases for the commissioning of the machine, details the operational modes, and gives an overview of the diagnostics available for beam-based measurements to verify the achievement of performance goals.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

BEAM POSITIONING CONCEPT AND TOLERANCE CONSIDERATIONS FOR bERLinPro*

bERLinPro is an ERL project at Helmholtz-Zentrum Berlin, with the goal to illuminate the challenges and promises of a high brightness 100 mA superconducting RF gun in combination with a 50 MeV return loop and energy recovery [1, 2]. The precision of the beam position in a single turn machine might be relaxed compared to the demands in storage rings. Still, a trajectory correction concept has to...

متن کامل

MACHINE PROTECTION CONSIDERATIONS FOR bERLinPro

The Berlin energy-recovery-linac project bERLinPro at the HZB is a 50MeV ERL test facility, which addresses physical and technological questions for future superconducting rf based high brightness, high current electron beam sources. The combination of a 100mA cw beam, electron bunches with normalized emittances lower than 1mm ·mrad and the magnet optics of bERLinPro leads to power densities ca...

متن کامل

120kW RF Power Input Couplers for BERLinPro

The 50MeV, 100mA energy-recovery-linac (ERL) demonstration facility bERLinPro is currently undergoing construction at HZB. The high power injection system, that will deliver a beam at 6MeV, is split into a 1.4 cell SRF photo injector and three Cornell-style 2-cell boosters. The injector and two of the booster cavities will provide about 2MeV each and must handle up to 220 kW of beam loading. Ne...

متن کامل

OPTICS DEVELOPMENT AND TRAJECTORY TUNING OF bERLinPro AT LOW ENERGIES*

The Berlin Energy Recovery Linac project has taken shape during the past year. The magnets have been set up in the newly constructed subterraneous hall; first electrons are expected in the SRF-gun test laboratory in June 2017. Starting in February 2018 the complete gun module will be transferred to the accelerator hall for the commissioning of bERLinPro. For the first months, operation is plann...

متن کامل

STATUS OF THE bERLinPro MAIN LINAC MODULE*

Beam operation of the bERLinPro energy recovery linac project, whose construction is under way, will initially start using the photoinjector and booster modules. In a second step the recirculation beam line and the main Linac module will be added. Here the current design status of the main linac module is described. Results of wake field simulations are compared for different set ups. We also r...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017