An MILP approach to Multi-location, Multi-Period Equipment Selection for Surface Mining with Case Studies
نویسندگان
چکیده
In the surface mining industry, the Equipment Selection Problem involves choosing an appropriate fleet of trucks and loaders such that the long-term mine plan can be satisfied. An important characteristic for multi-location (multi-location and multi-dumpsite) mines is that the underlying problem is a multi-commodity flow problem. The problem is therefore at least as difficult as the fixed-charge, capacitated multi-commodity flow problem. For long-term schedules it is useful to consider both the purchase and salvage of the equipment, since equipment may be superseded, and there is the possibility of pre-existing equipment. This may also lead to heterogeneous fleets and arising compatibility considerations. In this paper, we consider two case studies provided by our industry partner. We develop a mixed-integer linear programming model for heterogeneous equipment selection in a surface mine with multiple locations and a multiple period schedule. Encoded in the solution is an allocation scheme in addition to a purchase and salvage policy. We develop a solution approach, including variable preprocessing, to tackle this large-scale problem. We illustrate the computational effectiveness of the resulting model on the two case studies for large sets of equipment and long-term schedule scenarios.
منابع مشابه
Facility Location and Inventory Balancing in a Multi-period Multi-echelon Multi-objective Supply Chain: An MOEA Approach
A comprehensive and integrated study of any supply chain (SC) environment is a vital requirement that can create various advantages for the SC owners. This consideration causes productive managing of the SC through its whole wide components from upstream suppliers to downstream retailers and customers. On this issue, despite many valuable studies reported in the current literature, considerabl...
متن کاملA new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost
Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...
متن کاملOPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING
During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...
متن کاملAn Integrated Approach for Collection Center Selection in Reverse Logistics
In this paper, a hybrid multi-criteria decision-making (MCDM)-method and mixed integer linear programming (MILP) approach in order to evaluation of the returned products' collectors along with their ordered quantities, is utilized. Firstly, the most important criteria of collection center in the car industry are identified. Then, in order to evaluate these proposed criteria, a hybrid Fuzzy Deci...
متن کاملA Multi-Criteria Decision Making for Location Selection in the Niger Delta Using Fuzzy TOPSIS Approach
Making an informed decision with regards to a suitable business location or site selection for organizations is becoming challenging for business decision makers globally; and even more challenging in business environment that are saddled with uncertainties. The continues raise of multiple criteria variation of site preferences has also necessitated the application of advanced decision making t...
متن کامل