A recursive algorithm for a pipeline maintenance scheduling problem
نویسندگان
چکیده
This paper deals with the problem of preventive maintenance (PM) scheduling of pipelines subject to external corrosion defects. The preventive maintenance strategy involves an inspection step at some epoch, together with a repair schedule. This paper proposes to determine the repair schedule as well as an inspection time minimizing the maintenance cost. This problem is formulated as a binary integer non-linear programming model and we approach it under a decision support framework. We derive a polynomial-time algorithm that computes the optimum PM schedule and suggests different PM strategies in order to assist practitioners in making decision.
منابع مشابه
A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem
Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...
متن کاملFlow shop Scheduling Problem with Maintenance Coordination: a New Approach
This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).
In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA). In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have be...
متن کاملJIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CoRR
دوره abs/1610.01150 شماره
صفحات -
تاریخ انتشار 2016