Hypo International Strengthens Risk Management with a Large-Scale, Secure Spreadsheet-Management Framework
نویسندگان
چکیده
We present the solution that Hypo Real Estate Bank International (Hypo) implemented to perform Monte Carlo simulations of its commercial real estate credit risk. The solution uses Risk Integrated’s proprietary software, the Specialized Finance System, which is supported by another Risk Integrated technology, the Enterprise Spreadsheet Platform. The platform embeds individual master spreadsheets within a high-performance, server-based, computational-engine architecture; thus, it enables them to be accessed enterprise-wide. The major benefit of this approach is the near-elimination of spreadsheet risk in Hypo’s banking system. The solution allows domain experts to have the flexible programming power that spreadsheets provide; however, it does not sacrifice the reliability and auditability expected from traditional business applications.
منابع مشابه
On The Moments Of The Time To Ruin Distribution When The Initial Reserve Is Large And Claim Amount Distribution Is Two Stage Hypo Exponential Distribution
In any classical risk model one of the important random variable is time to ruin. As time to ruin warns the management for possible adverse situations that may arise, the distribution of time to ruin place a vital role in the day to day transactions of the any insurance company. Moments of the distribution are also important as coefficient of skewness of the distribution is very important in ac...
متن کاملA Computational Framework for the Near Elimination of Spreadsheet Risk
We present Risk Integrated's Enterprise Spreadsheet Platform (ESP), a technical approach to the near-elimination of spreadsheet risk in the enterprise computing environment, whilst maintaining the full flexibility of spreadsheets for modelling complex financial structures and processes. In its Basic Mode of use, the system comprises a secure and robust centralised spreadsheet management framewo...
متن کاملTowards Measuring the Project Management Process During Large Scale Software System Implementation Phase
Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...
متن کاملA Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses
The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...
متن کاملConstructive Dynamisms of Large-Scale Urban Projects by the Space Political Economy Approach; a Case Study of Mashhad Metropolis
Aims: The development of large-scale construction projects has transformed the shape of cities towards specific objectives and based on economic and political perspectives that dominate policy-making and planning in cities. The purpose of the research was to study and analyze the spatiality of Mashhad construction mega-projects and to explain the constructive forces and dynamisms of these proje...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Interfaces
دوره 38 شماره
صفحات -
تاریخ انتشار 2008