The long-term effects of a token economy on safety performance in open-pit mining.
نویسندگان
چکیده
A token economy that used trading stamps as tokens was instituted at two dangerous open-pit mines. Employees earned stamps for working without lost-time injuries, for being in work groups in which all other workers had no lost-time injuries, for not being involved in equipment-damaging accidents, for making adopted safety suggestions, and for unusual behavior which prevented an injury or accident. They lost stamp awards if they or other workers in their group were injured, caused equipment damage, or failed to report accidents or injuries. The stamps could be exchanged for a selection of thousands of items at redemption stores. Implementation of the token economy was followed by large reductions in the number of days lost from work because of injuries, the number of lost-time injuries, and the costs of accidents and injuries. The reductions in costs far exceeded the costs of operating the token economy. All improvements were maintained over several years.
منابع مشابه
Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty
Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...
متن کاملA Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty
It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...
متن کاملA Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کاملCommodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method
Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...
متن کاملAn imperialist competitive algorithm for solving the production scheduling problem in open pit mine
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Journal of applied behavior analysis
دوره 20 3 شماره
صفحات -
تاریخ انتشار 1987