A Lagrangian Relaxation Based Forward-Backward Improvement Heuristic for Maximising the Net Present Value of Resource-Constrained Projects

نویسندگان

  • Hanyu Gu
  • Andreas Schutt
  • Peter J. Stuckey
چکیده

In this paper we propose a forward-backward improvement heuristic for the variant of resource-constrained project scheduling problem aiming to maximise the net present value of a project. It relies on the Lagrangian relaxation method to generate an initial set of schedules which are then improved by the iterative forward/backward scheduling technique. It greatly improves the performance of the Lagrangian relaxation based heuristics in the literature and is a strong competitor to the best meta-heuristics. We also embed this heuristic into a state-of-the-art CP solver. Experimentation carried out on a comprehensive set of test data indicates we compare favorably with the state of the art.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

Maximising the Net Present Value of Large Resource-Constrained Projects

The Resource-constrained Project Scheduling Problem (Rcpsp), in which a schedule must obey resource constraints and precedence constraints between pairs of activities, is one of the most studied scheduling problems. An important variation of this problem (RcpspDc) is to find a schedule which maximises the net present value (discounted cash flow). Large industrial applications can require thousa...

متن کامل

Constrained Renewable Resource Allocation in Fuzzy Metagraphs via Min-Slack

This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...

متن کامل

A Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities

In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013