A continuous time model for multiple yard crane scheduling with last minute job arrivals
نویسندگان
چکیده
Container terminal (CT) operations are often bottlenecked by slow YC (yard crane) movements. Efficient YC scheduling to reduce the PM waiting time is therefore critical in increasing a CT’s throughput. This paper develops an efficient continuous time MILP model for YC scheduling. The model treats realistic operational constraints such as multiple inter-crane interference, fixed YC separation distances, simultaneous container storage/retrievals, realistic YC acceleration/deceleration stages and gantry time, and require far fewer integer variables than previous work. The model significantly improves the solution quality compared to the existing discrete time models and other heuristics found in the literature. Using heuristics and Corresponding author. E-mail: [email protected]; [email protected]. Tel: (81)257791516. Fax: (81)257791187 Y. C. Wu was supported by NSC 99-2410-H-110-053-MY3 a rolling-horizon algorithm, our model can solve actual container yard (CY) problems quickly and robustly in polynomial time. Also, to cope with the last minute container arrivals which can disrupt routine CT operations, two methods for handling these last minute job insertions are discussed and compared.
منابع مشابه
A Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملYard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملQuay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...
متن کاملThe simultaneous reshuffle and yard crane scheduling problem in container terminals
This paper studies the simultaneous reshuffle and yard crane scheduling problem in the yard of container terminals, which is one of the key logistics problems affecting the operation efficiency in container terminals. Although the reshuffle scheduling problem has received many research attention due to its importance, the problem without considering yard crane is not very practical, which is be...
متن کاملYard Crane Pools and Optimum Layouts for Storage Yards of Container Terminals
As more and more container terminals open up all over the world, competition for business is becoming very intense for container terminal operators. They are finding out that even to keep their existing Sea Line customers, they have to make them happy by offering higher quality service. The quality of service they can provide depends on their operating policies and the design of the terminal la...
متن کامل