Application of Sizing Estimation Techniques for Business Critical Software Project Management

نویسندگان

  • Parvez Mahmood Khan
  • M. M. Sufyan Beg
چکیده

Estimation is one of the most critical areas in software project management life cycle, which is still evolving and less matured as compared to many other industries like construction, manufacturing etc. Originally the word estimation, in the context of software projects use to refer to cost and duration estimates only with software-size almost always assumed to be a fixed input. Continued legacy of bad estimates has compelled researchers, practitioners and business organizations to draw their attention towards another dimension of the problem and seriously validate an additional component – size estimation. Recent studies have shown that size is the principal determinant of cost, and therefore an accurate size estimate is crucial to good cost estimation[10]. Improving the accuracy of size estimates is, therefore, instrumental in improving the accuracy of cost and schedule estimates. Moreover, software size and cost estimates have the highest utility at the time of project inception when most important decisions (e.g. budget allocation, personnel allocation, etc). are taken. The dilemma, however, is that only highlevel requirements for a project are available at this stage. Leveraging this high-level information to produce an accurate estimate of software size is an extremely challenging and high risk task. This study acknowledges the presence and effect of risk in any software estimate and offers pragmatic strategies for risk mitigation.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Comparison of Size Estimation Techniques Applied Early in the Life Cycle

Timing is one of the most critical factors of software size estimation. We need to know quite a bit about the software project to make a meaningful size estimate. However, most of the software estimates should be performed at the beginning of the life cycle, when we do not yet know the problem we are going to solve. In the literature, there are few early size estimation methods. This study demo...

متن کامل

Improving Size Estimates Using Historical Data

business objects (Obj) 16 Basic abstract geoscience business objects, including projects, wells, well logs, markers, zones, and seismic data Concrete business object input/output (I/O) 15 Concrete input/output behaviors for abstract business object persistence mechanisms Data import/export filters (Filter) 14 Abstract factories, strategies, and GUI components for importing and exporting “foreig...

متن کامل

Bridging the semantic gap for software effort estimation by hierarchical feature selection techniques

Software project management is one of the significant activates in the software development process. Software Development Effort Estimation (SDEE) is a challenging task in the software project management. SDEE is an old activity in computer industry from 1940s and has been reviewed several times. A SDEE model is appropriate if it provides the accuracy and confidence simultaneously before softwa...

متن کامل

“An Expert Estimator Tool to Estimate Project Cost and Risk with early stage of function points”

Software estimation provides an important tool for project planning; whose quality and accuracy greatly affect the success of a project. There are several area of the software engineering in which we can use the function point analysis like project planning, project construction, software implementation etc. In software development, accuracy and efficiency of cost estimation methodology for a w...

متن کامل

A COSMIC Measurement Procedure for BPMN Diagrams

In recent years, the estimation of effort, budget and time has been a fundamental step in the software project life cycle. Having this knowledge it is possible to manage and control a software project. So that, it is important to have these estimations as early as possible in order to produce a sound schedule for the project. Taking into account that BPMN diagrams are widely used in industry fo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • CoRR

دوره abs/1405.6335  شماره 

صفحات  -

تاریخ انتشار 2013