Maximizing the weighted number of just-in-time jobs in several two-machine scheduling systems
نویسندگان
چکیده
The problem of maximizing the weighted number of just-in-time jobs in a two-machine ow shop scheduling system is known to be NP-hard [4]. However, the question of whether this problem is strongly or ordinary NP-hard remains an open question. We provide a pseudo-polynomial time algorithm to solve this problem, proving that it is NP-hard in the ordinary sense. Moreover, we show how the pseudo-polynomial algorithm can be converted to a fully polynomial time approximation scheme (FPTAS). In addition, we prove that the same problem is strongly NP-hard for both a two-machine job shop scheduling system and a two-machine open shop scheduling system. This research was supported by THE ISRAEL SCIENCE FOUNDATION (grant No. 633/08). Partial support by the Paul Ivanier Center for Robotics and Production Management, Ben-Gurion University of the Negev is also gratefully acknowledged. ye-mails: [email protected] and [email protected]
منابع مشابه
A Possibility Linear Programming Approach to Solve a Fuzzy Single Machine Scheduling Problem
This paper employs an interactive possibility linear programming approach to solve a single machine scheduling problem with imprecise processing times, due dates, as well as earliness and tardiness penalties of jobs. The proposed approach is based on a strategy of minimizing the most possible value of the imprecise total costs, maximizing the possibility of obtaining a lower total costs, and mi...
متن کاملMinimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...
متن کاملA branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem
In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery. jobs have to be scheduled on a single machine and delivered to customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA...
متن کاملArtificial Immune System for Single Machine Scheduling and Batching Problem in Supply Chain
This paper addresses a production and outbound distribution scheduling problem in which a set of jobs have to be process on a single machine for delivery to customers or to other machines for further processing. We assume that there is a sufficient number of vehicles and the delivery costs is independent of batch size but it is dependent on each trip. In this paper, we present an Artificial Imm...
متن کاملA New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm
This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Scheduling
دوره 15 شماره
صفحات -
تاریخ انتشار 2012