The extended kanban control system for production coordination of assembly manufacturing systems
نویسندگان
چکیده
CLAUDINE CHAOUIYA, GEORGE LIBEROPOULOS and YVES DALLERY Departement Genie Bio Medical (ESIL/GBM), Ecole Superieure d'Ingenieurs de Luminy, Parc Scienti®que et Technologique de Luminy, case 925, FR-13288 Marseille Cedex 9, France E-mail: [email protected] Department of Mechanical and Industrial Engineering, University of Thessaly, Pedion Areos, GR-38334, Volos, Greece E-mail: [email protected] Laboratoire Productique et Logistique, Ecole Centrale de Paris, Grande Voie des Vignes, FR-92295 Chatenay-Malabry Cedex, France E-mail: [email protected]
منابع مشابه
Simulation of a Two Cards JIT Production System
This paper presents a summary of the results from the simulation of a given two-stages production system which uses JIT. The system consists of an assembly line with two automated assembly cells and two assembly stock points and one manufacturing cell with three manufacturing stock points for storing reserved parts and one receiving stock. Carts with fixed capacity are used for handling the par...
متن کاملSimulation of a Two Cards JIT Production System
This paper presents a summary of the results from the simulation of a given two-stages production system which uses JIT. The system consists of an assembly line with two automated assembly cells and two assembly stock points and one manufacturing cell with three manufacturing stock points for storing reserved parts and one receiving stock. Carts with fixed capacity are used for handling the par...
متن کاملImplementation of Just in Time Production through Kanban System
Uncertainties brought about by fluctuations in demand and customers’ requirements have led many established companies to improve their manufacturing process by adopting the Kanban system. By doing so, they are able to manufacture and supply the right product, in the right quantity, at the right place and time. Implementation of the Kanban system resulted in reduction of inventory to minimum lev...
متن کاملPetri Net Models of Pull Control Systems for Assembly Manufacturing Systems
Pull control systems are a good way to control material flow in manufacturing systems. In this paper we are interested in four control mechanisms: the Base Stock Control System (BSCS), the Kanban Control System (KCS), the Generalized Kanban Control System (GKCS) and the Extended Kanban Control System (EKCS). The BSCS and the KCS are well known simple pull control mechanisms. The better performi...
متن کاملMulti-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)
In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...
متن کاملStability of a `Signal Kanban' Manufacturing System
Signal kanban production control systems are often used in manufacturing systems with signiicant setup times where more conventional kanban systems are inappropriate. This paper analyzes signal kanban systems under demands with bounded uctuation. It is shown that such systems are stable in the sense that cumulative demand at any time trails cumulative demand by no more than a constant. We deter...
متن کامل