Secondary Critical Path in a Fuzzy Project Network

نویسندگان

  • K. Usha Madhuri
  • N. Ravi Shankar
  • Ravi Shankar
چکیده

In a fuzzy project network, the higher risk path is called possible critical path. Secondary critical path is one of the possible critical path in fuzzy project network and it plays an important role in the project scheduling, risk analysis and time-cost trade-off problems in fuzzy environment. In this paper, triangular fuzzy numbers are used to express the operation times for all activities in fuzzy project network. We propose a method to find secondary critical path(s) in a fuzzy project network using the fuzzy free float. RM approach is used to rank fuzzy numbers to find fuzzy critical path. Two examples are given to describe the method.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analysis of critical paths in a project network with random fuzzy activity times

Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...

متن کامل

Solving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets

Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternativ...

متن کامل

An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks

  We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...

متن کامل

A Study on Exponential Fuzzy Numbers Using alpha-Cuts

In this study a new approach to rank exponential fuzzy numbers using  -cuts is established. The metric distance of the interval numbers is extended to exponential fuzzy numbers. By using the ranking of exponential fuzzy numbers and using  -cuts the critical path of a project network is solved and illustrated by numerical examples. Keywords: Exponential Fuzzy Numbers,  -cuts, Metric Dista...

متن کامل

A simple approach to fuzzy critical path analysis in project networks

In this paper, we propose a new approach to critical path analysis in a project network whose activity times are uncertain. The uncertain parameters in the project network are represented by fuzzy numbers. We use fuzzy arithmetic and a fuzzy ranking method to determine the fuzzy critical path of the project network without converting the fuzzy activity times to classical numbers. The proposed m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014