An analytical framework for integrated maritime terminal scheduling problems with time windows

نویسندگان

  • Ghazal Assadipour
  • Ginger Y. Ke
  • Manish Verma
چکیده

Container transport, an integral part of intercontinental trade, has steadily increased over the past few decades. The productivity of such a system, in part, hinges on the efficient allocation of terminal resources such that the container transit time is minimized. This study provides an analytical framework, which entails efficient scheduling of quay and yard cranes, to minimize the time spent by containers at a terminal. A mixed-integer programming model is developed to capture the two-stage multi-processor characteristic of the problem, where each crane has specific time window availability. A genetic algorithm equipped with a novel decoding procedure is developed. The mixed-integer model is tested on a number of problem instances of varying sizes to gain managerial insights. ! 2014 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows

This paper presents a new model of two-echelon periodic supply vessel planning problem with time windows mix of facility location (PSVPTWMFL-2E) in an offshore oil and gas industry. The new mixed-integer nonlinear programming (MINLP) modelconsists ofa fleet composition problem and a location-routing problem (LRP). The aim of the model is to determine the size and type of large vessels in the fi...

متن کامل

An Integrated Model for Storage Location Assignment and Storage/Retrieval Scheduling in AS/RS system

An integrated optimization framework, including location assignment under grouping class-based storage policy and schedule of dual shuttle cranes, is offered by presenting a new optimization programming model. The objective functions, which are considered at this level, are the minimization of total costs and energy consumption. Scheduling of dual shuttle cranes among specified locations, which...

متن کامل

A Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint

In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...

متن کامل

Train Scheduling Problem - Phase II: A Simulation Integrated Genetic AlgorithmSystem

In [1] a feasible timetable generator stochastic simulation modeling framework for the train scheduling problem was developed to obtain a train timetable which includes train arrival and departure times at all visited stations and calculated average train travel time for all trains in the system. In this study, the framework is integrated with a genetic algorithm (GA) in order to get an optimal...

متن کامل

An Integrated Simulation And Optimization Approach For Seaside Terminal Operations

In this paper we focus our attention on the operational decision problems related to the seaside area of maritime container terminals. In particular, we face the Quay Crane Assignment Problem (QCAP) and Quay Crane Scheduling Problem (QCSP) with an integrated simulation-optimization approach. A 0/1 MIP model is developed in order to determine the optimal assignment, on a shift basis, of QCs to b...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Expert Syst. Appl.

دوره 41  شماره 

صفحات  -

تاریخ انتشار 2014