The Nine Deadly sins of Project Planning

نویسنده

  • Steve McConnell
چکیده

1. Not planning at all By far the most common planning problem is simply not planning at all, and this sin is easily avoided. A person need not be an expert planner to plan effectively. I’ve seen numerous instances of projects planned by rank amateurs that have run well simply because the people in charge had carefully considered their project’s specific needs. Forced to choose between an expert project planner who doesn’t carefully think through his plan or an amateur who has thoroughly evaluated his project needs, I’ll bet on the amateur every time.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Seven deadly sins of environmental epidemiology and the virtues of precaution.

The potentials for error in planning, conducting, reporting, and utilizing epidemiologic results can be considered in terms of the traditional 7 deadly sins. To counter these sins, epidemiologic virtues should be inspired by the precautionary principle. The remedies emphasize acknowledgment and exploration of the impact of uncertainties, weight-of-the-evidence assessments that consider what cou...

متن کامل

Acedia: Its Evolution from Deadly Sin to Psychiatric Syndrome.

lohannes Cassianus, more commonly known as John Cassian, wrote his treatise De Institutis Coenobiorumci de OctoPrincipalium Vitiorum Remediis Libri XII around the beginning of the fifth century A.D. This work is important because it introduced certain Eastern ideas into Western thought. Some of these ideas are of considerable psychiatric interest. Cassian first studied with St. Jerome in the Ea...

متن کامل

A New Multi-objective Model for Multi-mode Project Planning with Risk

The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...

متن کامل

The UNSIN project: exploring the molecular physiology of sins.

Although active learning works, promoting it in large undergraduate science classes is difficult. Here, three students (F. Naji, L. Salci, and G. Hoit) join their teacher (P. K. Rangachari) in describing one such attempt. Two cohorts in a first-year undergraduate biology course explored the molecular underpinnings of human misbehavior. Students were divided into 18 groups and randomly allotted ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • IEEE Software

دوره 18  شماره 

صفحات  -

تاریخ انتشار 2001