Adjustment of the moments of the project completion times when activity times are exponentially distributed
نویسنده
چکیده
The problem of determining the moment of the project completion time (MPCT) with stochastic activity durations is addressed. In the direct approach the MPCT is obtained after analyzing all possible network paths which is NP-hard problem. A recursive method for determining MPCT by proceeding iteratively over the nodes is the computationally least demanding and therefore the most efficient approach. Unfortunately, the moment methods which are available in literature ignore some aspects. In this paper, an adjustment of the moment completion time is discussed. Two illustrative examples are presented.
منابع مشابه
Analysis of two production inventory systems with buffer, retrials and different production rates
This paper considers the comparison of two ðs; SÞ production inventory systems with retrials of unsatisfied customers. The time for producing and adding each item to the inventory is exponentially distributed with rate b. However, a production rate ab higher than b is used at the beginning of the production. The higher production rate will reduce customers’ loss when inventory level appro...
متن کاملConstrained Non-Renewable Resource Allocation in Metagraphs with Discrete Random Times
In this paper, it is supposed that a project can be shown as a metagraph. The duration of activities are discrete random variables with known probability function, also one kind of consumable and constrained resource is required to execute each activity of the project.The objective of this paper is to maximize the probability of completion of stochastic metagraph before the due date of the proj...
متن کاملEconomic design of Hotelling’s T2 control chart on the presence of fixed sampling rate and exponentially assignable causes
Control charts are extensively used in manufacturing contexts to monitor production processes. This article illustrates economical design of a variable sample size and control limit Hotelling’s T2 control chart based on a novel cost model when occurrence times of the assignable causes are exponentially distributed. The proposed nonlinear cost model is an extension of Duncan’s (J Am Stat ...
متن کاملReliability of Repairable System with Removable Multi-Repairmen
In this investigation, the explicit expressions for reliability function and mean time to failure (MTTF) of a repairable system with provision of spares and removable multi-repair facility have been established. In removable repairmen strategy, the repairmen turn on when there are N or more than N failed units and turn-off when system is empty. The failure times of operating/spare units and rep...
متن کاملEvaluating project completion times when activity times are Weibull distributed
Activity networks have been used to model complex projects with wide applications in the field of production, planning and control. Stochastic activity networks (SANs) require a priori distribution function (d.f.) such as normal, exponential, Erlang and others. In this paper, a development of the moments method based on Weibull distribution of activity time is presented. The method provides an ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Annals OR
دوره 181 شماره
صفحات -
تاریخ انتشار 2010