Number : 1743 - 4041 Modelling Time - Constrained Software Development

نویسنده

  • Antony Powell
چکیده

Commercial pressures on time-to-market often require the development of software in situations where deadlines are very tight and non-negotiable. This type of development can be termed ‘time-constrained software development.’ The need to compress development timescales influences both the software process and the way it is managed. Conventional approaches to modelling tend to treat the development process as being linear, sequential and static. Whereas, the processes used to achieve timescale compression in industry are iterative, concurrent and dynamic. That is, they replace the notion of ‘right-first-time’ with one of ‘right-on-time.’ In this paper we propose a new modelling technique, called Capacity-Based Scheduling (CBS), to control risk across a portfolio of time-constrained projects. We show how schedule constraints can be modelled in order to predict the consequences of alternative plans and control schedule risk across a portfolio of time-constrained projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fuzzy resource-constrained project scheduling for GIS software development

Resource-constrained project scheduling (RCPS) problem can be defined as a combinatorial problem of constructing a special plan for performing a number of precedence related tasks that have to be executed with the use of limited uncertain resources. In this paper we study the framework of a heuristic approach to deal with uncertainty while modelling RCPS problem by considering a fuzzy set theor...

متن کامل

ISSN Number: 1743-4041 Back to the Future in NHS Reform

Purpose In the mid 1990s the NHS ‘did’ competition, in the mid 2000s the NHS is ‘doing’ choice. This paper aims to cut through the rhetoric, highlight the differences and parallels between then and now and identify if these differences will have a different or the same impact on local services. Design/methodology/approach – Following a review of literature from the 1990s, a qualitative research...

متن کامل

Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...

متن کامل

A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004