Improving the effectiveness of sickness benefit case management through a public-private partnership? A difference-in-difference analysis in eighteen Danish municipalities
نویسندگان
چکیده
BACKGROUND The aim of this study was to investigate whether a multidimensional public-private partnership intervention, focussing on improving the quality and efficiency of sickness benefit case management, reduced the sickness benefit duration and the duration until self-support. METHODS We used a difference-in-difference (DID) design with six intervention municipalities and 12 matched control municipalities in Denmark. The study sample comprised 282,103 sickness benefit spells exceeding four weeks. The intervention group with 110,291 spells received the intervention, and the control group with 171,812 spells received ordinary sickness benefit case management. Using register data, we fitted Cox proportional hazard ratio models, estimating hazard ratios (HR) and confidence intervals (CI). RESULTS We found no joint effect of the intervention on the sickness benefit duration (HR 1.02, CI 0.97-1.07) or the duration until self-support (HR 0.99, CI 0.96-1.02). The effect varied among the six municipalities, with sickness benefit HRs ranging from 0.96 (CI 0.93-1.00) to 1.13 (CI 1.08-1.18) and self-support HRs ranging from 0.91 (CI 0.82-1.00) to 1.11 (CI 1.06-1.17). CONCLUSIONS Compared to receiving ordinary sickness benefit management the intervention had on average no effect on the sickness benefit duration or duration until self-support. However, the effect varied considerably among the six municipalities possibly due to differences in the implementation or the complexity of the intervention.
منابع مشابه
Comparison of Hospital Efficiency and Performance Indices before and after the Implementation of Public-Private Partnership Model: A Case Study
Background and Objectives: Public– Private Partnership can increase the hospital efficiency as the main goal of a good management in healthcare. Hospital efficiency in utilizing resources can be measured through specific indices and analysis of data, after which we can expect to improve productivity in the system. Analysis of performance indices can be useful to achieve to the ...
متن کاملA Model for Public-Private Partnership in the Public Services Sector
Public-private partnership is a new way to expand public services through the private sector, which should be increasingly taken into consideration in Iran. This research aims at identifying effective factors in the success of public-private partnership and providing a model for the public services sector in Iran. The data collection tool was a questionnaire and the analytical unit and the stat...
متن کاملThe Challenges of the Performance Evaluation System and Effectiveness of Human Resources Management Practices (Case Study: Iran\'s Petrochemical Industry)
The main objective of the present survey is to conduct a comparative analysis of the challenges of the performance evaluation system in two private and public sectors and their impact on effectiveness of human resources management practices. This survey was conducted using the field-descriptive method. The historical study method was used to collect theoretical subjects and the field study meth...
متن کاملAn Assessment of Factors that Impact Government Oversight of Public-Private Partnership Contracts of the National Iranian Gas Company
One of success factors of public-private partnership contracts is the effective public supervision on their implementation, including standards to be observed by the private party to the partnership. In other words, a key element in using private sector’s potential is defining activity standards and precise supervision of their implementation. In this research we identify the factors that impa...
متن کاملStudy on the Impact of Implementing Public-Private Partnership (PPP) at Hasheminejad Kidney Center
Background and Objectives: As with most countries, in the developing communities, providing high quality services in the field of health care is affected by limited financial resources. Applying the positive stimuli germane to the private sector to public hospital may be one solution to the public sector's problems, and the health care system, in general, for reducing hospital construction and ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره 17 شماره
صفحات -
تاریخ انتشار 2017