Monitoring and Scheduling Methods for MIMO- FIFO Systems Utilizing Max-Plus Linear Representation

نویسندگان

  • Hiroyuki Goto
  • Shiro Masuda
چکیده

Abstract. This paper proposes an approach to monitoring and scheduling methods for repetitive MIMO-FIFO DESs. We use max-plus algebra for modeling and formulation, known as an effective approach for controller design for this type of system. Because a certain type of linear equations in max-plus algebra can represent the system’s behavior, the principal concerns in past researches were how to solve the equations. However, the researches focused mainly on analyses of the relation between inputs and outputs of the system, which implies that the changes or the slacks of internal states were not clarified well. We first examine several properties of the corresponding state variables, which contribute to finding and tracing the float times in each process. Moreover, we provide a rescheduling method that can take into account delays or changes of the internal states. These methods would be useful in schedule control or progress management.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Online MPL Scheduling of Backward Type for Repetitive Systems with MIMO-FIFO Structure

This paper proposes an online scheduling method considering no-concurrency of resource with subsequent event. We focus on repetitive discrete event systems with MIMO (Multiple Inputs and Multiple Outputs)-FIFO structure. The behavior of such kind of systems can be described by linear equations in max-plus algebra, which is also called the MPL (Max-Plus Linear) systems. Conventional MPL represen...

متن کامل

Resolution of Resource Conflict Between the Different Two Projects in MPL-CCPM Representation

Max-Plus-Linear (MPL) system is known as a solution for scheduling problems of a class of discrete event systems. Typical systems include: manufacturing system and project management, etc. In such systems, the initial schedule is frequently changed due to unpredictable disturbances. Critical Chain Project Management (CCPM) method is a management method that can shorten the time required to comp...

متن کامل

Reduction and Analysis of a Max-Plus Linear System to a Constraint Satisfaction Problem for Mixed Integer Programming

This research develops a solution method for project scheduling represented by a max-plus-linear (MPL) form. Max-plus-linear representation is an approach to model and analyze a class of discrete-event systems, in which the behavior of a target system is represented by linear equations in max-plus algebra. Several types of MPL equations can be reduced to a constraint satisfaction problem (CSP) ...

متن کامل

Evaluating the deformation monitoring capability of a ground based SAR system with MIMO antenna

By increasing the applicability of ground-based SAR (GBSAR) systems in geoscience and remote sensing, the development and evaluation of new systems have gained attention. GBSAR systems can be utilized for monitoring areas that are hard to or cannot be seen by the airborne or spaceborne systems. Furthermore, they have better spatial and temporal resolutions and are cost-effective and easy to imp...

متن کامل

Soft Switching MBC Controller for MIMO Linear Hybrid Systems

Switching supervisory is the most important section of a feedback control process inMIMO hybrid systems. By choosing a non-compatible controller, system may go tounstable mode or high overshoot response. In this paper, a new method of switchingfor selecting MBC controllers is discussed. Results of the simulation show the MIMO(2-in 2-out) linear hybrid system can be switched stable and low overs...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008