A Connectionist Method to Solve Job Shop Problems

نویسندگان

  • Marko Fabiunke
  • Gerd Kock
چکیده

We propose a novel framework to solve job shop scheduling problems based on connectionist ideas of distributed information processing. In our approach each operation of a given job shop problem is considered to be a simple agent looking for a position in time such that all its time and resource constraints are satissed. Each agent considers the current time position of its constraint neighbors to gradually change its own position to reach this goal. All agents together form a recurrent dynamical system which either self-organizes after some iterations to a feasible schedule or fails to do so depending on the constrainedness of the problem. By gradually increasing the constrainedness through decreasing the allowable overall processing time for a valid schedule, better and better solutions are found up to the point where no further improvements can be made.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method

In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...

متن کامل

A New Approach in Job Shop Scheduling: Overlapping Operation

In this paper, a new approach to overlapping operations in job shop scheduling is presented. In many job shops, a customer demand can be met in more than one way for each job, where demand determines the quantity of each finished job ordered by a customer. In each job, embedded operations can be performed due to overlapping considerations in which each operation may be overlapped with the other...

متن کامل

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

A Fuzzy Algorithm for the m-Machine, n-Job Flow Shop Sequencing Problem

Flow shop sequencing problem is included in NP-hard problems and a number of heuristic methods have been developed to solve it. Most of these methods are offered for the crisp processing time. However fuzzy algorithm is appropriate for the problems with fuzzy processing time. This paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...

متن کامل

A Fuzzy Algorithm for the m-Machine, n-Job Flow Shop Sequencing Problem

Flow shop sequencing problem is included in NP-hard problems and a number of heuristic methods have been developed to solve it. Most of these methods are offered for the crisp processing time. However fuzzy algorithm is appropriate for the problems with fuzzy processing time. This paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Cybernetics and Systems

دوره 31  شماره 

صفحات  -

تاریخ انتشار 2000