Multi-point Concurrent Tracking and Surveying in Construction Field
نویسندگان
چکیده
Total station has been predominantly applied in stationary survey scenarios in construction. With the moving target tracking and point survey automation functions, a robotic total station (RTS) lends itself well to more dynamic applications. Nevertheless, a RTS unit is still unable to track multiple targets simultaneously or to survey a target point when the line-of-sight is temporarily unavailable. In this paper, we propose a methodology to synchronize and automate multiple RTS units intended to address dynamic tracking and surveying applications in the construction field. By using the application programming interface (API) from the manufacturer, we implement the proposed methodology and the prototype system integrates two RTS units in regard to space and time and communicates survey command instructions among RTS units through wireless networks. The two RTS units can be operated to survey the two ends of one swinging sling concurrently in order to retrieve the actual length of the sling within several millimeters accuracy. Besides, in applications where line-of-sight between a target object and one RTS unit cannot be guaranteed all the time, continuous surveying can be materialized by automatically delegating the task to another synchronized RTS unit with clear view of the target object. A field test was conducted to demonstrate the application of the proposed automation approach in which sling length was measured of a rigging framework used for lifting industrial modules. The testing results are presented and achievable accuracy and reliability are discussed. The proposed solution overcomes the limitations of global positioning system (GPS) and laser scanning and holds high potential to provide cost effective solutions to many dynamic field applications.
منابع مشابه
Modeling of Optimal Distances of Surveying Stations for Monitoring Astable Engineering Structures Using Geodetic Methods
Large and astable engineering structures are the great importance and the behavior of such structures is usually made in Geotechnical and Geodetic methods (engineering geodesy). In the geodetic methods, the selection of appropriate surveying stations, in terms of distribution, locations, and distant of the target points to stations the control network, have a significant role in determining th...
متن کاملEvaluating Technical Requirements to Achieve Maximum Power Point in Photovoltaic Powered Z-Source Inverter
One of the key challenges of employing photovoltaic systems is to extract maximum power of the panels. This problem is known as maximum power point tracking (MPPT) technique. The MPPT stands for establishing situation in which output power of the panels reaches its maximum allowable power. In this context, this paper is to assess the technical requirements to achieve maximum output power of a n...
متن کاملIdentification and Assessment of Key Political Risk Factors Influencing Corporate Performance of International Construction Companies in North- Eastern (NE), Nigeria
International construction companies have settled in Africa and especially Nigeria, to compete for infrastructural projects, in a bid to extend their services across their borders. The trans-border extension of the services offered by these international multi-nationals exposes them to the political risk factors pertinent with the host country. In order to survive the harsh realities of the po...
متن کاملImprovement of perturb and observe method for maximum power point tracking in wind energy conversion system using fuzzy controller
One of the main problems in wind energy conversion system (WECS) is how to achieve maximum output power in different wind speeds. Maximum methods for maximum power point tracking in wind energy conversion systems require the knowledge of system characteristics and mechanic sensors. So, using these methods practically will follow with high price and an abundant difficulties. In this pape...
متن کاملImprovement of perturb and observe method for maximum power point tracking in wind energy conversion system using fuzzy controller
One of the main problems in wind energy conversion system (WECS) is how to achieve maximum output power in different wind speeds. Maximum methods for maximum power point tracking in wind energy conversion systems require the knowledge of system characteristics and mechanic sensors. So, using these methods practically will follow with high price and an abundant difficulties. In this pape...
متن کامل