Production lot sizingwith process deterioration andmachine breakdown under inspection schedule

نویسندگان

  • Tulika Chakraborty
  • B. C. Giri
  • K. S. Chaudhuri
چکیده

The paper develops integrated production, inventory and maintenance models for a deteriorating production system in which the production facility may not only shift from an ‘in-control’ state to an ‘out-of-control’ state but also may break down at any random point in time during a production run. In case of machine breakdown, production of the interrupted lot is aborted and a new production lot is started when the on-hand inventory is depleted after corrective repair. The process is inspected during each production run to examine the state of the production process. If it is found in the ‘in-control’ state then either (a) no action is taken except at the time of last inspection where preventive maintenance is done (inspection policy-I) or (b) preventive maintenance is performed (inspection policy-II). If, however, the process is found to be in the ‘out-of-control’ state at any inspection then restoration is done. The proposed models are formulated under general shift, breakdown and repair time distributions. As it is, in general, difficult to find the optimal production policy under inspection policy-I, a suboptimal production policy is derived. Numerical examples are taken to determine numerically the optimal/suboptimal production policies of the proposed models, to examine the sensitivity of important model parameters and to compare the performance of inspection and no inspection policies. 2007 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Process Adjustment under Inspection Errors Considering the Cycle Time of Production

Process adjustment, also known as process targeting, is one of the classical problems in the field of quality control and production economics. In the process adjustment problem, it is assumed that process parameters are variables and the aim is to determine these parameters such that certain economic criteria are optimally satisfied. The aim of this paper is to determine the optimal process ad...

متن کامل

Optimal Lot Sizing with Unreliable Product ion System

The classical lot, sizing model deals with economic lot sizing for production in a deterministic framework. In real life, various forms of uncertainty affect the production. These include machine breakdown, quality variations, and so on. This paper develops a model with unreliable production systems and under alternative repair option strategies. @ 2000 Elsevier Science Ltd. All rights reserved...

متن کامل

Economic Production Quantity in Reworkable Production Systems with Inspection Errors, Scraps and Backlogging

The classical economic production quantity (EPQ) model is a well-known and commonly used inventory control technique. Common assumptions in this model are that all units produced are of perfect quality and shortage is not allowed, since in practice shortage, non-conforming product or scrap items are possible, these assumptions will underestimate the actual required quantity. The objective of th...

متن کامل

On the optimality of a general integrated production inventory system with time varying demand, production and deterioration rates

Typical models of the production inventory systems assume that lot sizes of raw materials and final products are treated separately which leads to suboptimization production process. In this paper, a unified inventory model of an integrated production inventory system, where each of production, demand and deterioration rates are general functions of time, is considered. Shortage for the final p...

متن کامل

A knowledge-based evolutionary proactive scheduling approach in the presence of machine breakdown and deterioration effect

This paper considers proactive scheduling in response to stochastic machine breakdown under deteriorating production environments, where the actual processing time of a job gets longer along with machine’s usage and age. It is assumed that a job’s processing time is controllable by allocating extra resources and the machine breakdown can be described using a given probability distribution. If a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015