Analysis of Stochastic Assembly with GI-Distributed Assembly Time
نویسندگان
چکیده
In this paper we study an assembly system which supplies an end-product inventory. We allow assembly operation times to be G.I. distributed and analyze the system as a Markov renewal process, deriving a closed-form expression for long-run Palm probabilities of both kit and end-product inventory positions. We then present a numerical procedure to obtain various performance measures using the matrix-geometric approach. Finally, we describe insights about the operation of the assembly system which are made possible by our analysis, in particular, showing the effects of kit buffer capacity on kit and end-product inventory positions.
منابع مشابه
A Multi-Objective Mixed-Model Assembly Line Sequencing Problem With Stochastic Operation Time
In today’s competitive market, those producers who can quickly adapt themselves todiverse demands of customers are successful. Therefore, in order to satisfy these demands of market, Mixed-model assembly line (MMAL) has an increasing growth in industry. A mixed-model assembly line (MMAL) is a type of production line in which varieties of products with common base characteristics are assembled o...
متن کاملMulti-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)
In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...
متن کاملMixed-Model Assembly Line Balancing with Considering Reliability
This paper presents a multi-objective simulated annealing algorithm for the mixed-model assembly line balancing with stochastic processing times. Since, the stochastic task times may have effects on the bottlenecks of a system, maximizing the weighted line efficiency (equivalent to the minimizing the number of station), minimizing the weighted smoothness index and maximizing the system reliabil...
متن کاملA novel bi-level stochastic programming model for supply chain network design with assembly line balancing under demand uncertainty
This paper investigates the integration of strategic and tactical decisions in the supply chain network design (SCND) considering assembly line balancing (ALB) under demand uncertainty. Due to the decentralized decisions, a novel bi-level stochastic programming (BLSP) model has been developed in which SCND problem has been considered in the upper-level model, while the lower-level model contain...
متن کاملA two-stage stochastic rule-based model to determine pre-assembly buffer content
This study considers instant decision-making needs of the automobile manufactures for resequencing vehicles before final assembly (FA). We propose a rule-based two-stage stochastic model to determine the number of spare vehicles that should be kept in the pre-assembly buffer to restore the altered sequence due to paint defects and upstream department constraints. First stage of the model decide...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- INFORMS Journal on Computing
دوره 11 شماره
صفحات -
تاریخ انتشار 1999