Highway Construction Productivity Measurement with a Wireless Real-Time Productivity Measurement System

نویسندگان

  • Seonghoon Kim
  • Yong Bai
  • Yang-Ki Jung
  • Dukgeun Yun
چکیده

Because the quantity of work is relatively easy to estimate accurately by using printed drawings or computer-assisted drafting system and specifications, the accuracy of the duration depends largely on the accuracy of construction productivity. It is not difficult to understand why a scheduler without accurate productivity data is unable to produce a reliable cpm schedule. In summary, poor productivity data affect the accuracy of activity duration; inaccurate activity duration makes it impossible to produce a reliable construction schedule. To improve the quality of construction schedules, there is a need to develop an advanced productivity measurement system that will overcome mentioned shortfalls.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

A Real-time Motion Tracking Wireless System for Upper Limb Exosuit Based on Inertial Measurement Units and Flex Sensors (TECHNICAL NOTE)

This paper puts forward a real-time angular tracking (motion capture) system for a low cost upper limb exosuit based on sensor fusion; which is integrated by an elastic sleeve-mitten, two inertial measurement units (IMU), two flex sensors and a wireless communication system. The device can accurately detect the angular position of the shoulder (flexion-extension, abduction-adduction and interna...

متن کامل

Application of Malmquist Index in Two-Stage DEA for Measurement of Productivity Growth

The purpose of this paper is to develop an output oriented methodology for calculating productivity growth by using Malmquist productivity index (MPI) and two different data envelopment analysis (DEA) views (optimistic and pessimistic) simultaneously, and apply it to five Iranian Commercial Banks over the four time period (2009-2013). Consequently, we have proposed a new approach called the dou...

متن کامل

DEVELOPMENT OF PRODUCTIVITY MEASUREMENT AND ANALYSIS FRAMEWORK FOR MANUFACTURING COMPANIES

The purpose of this research is to present an alternative approach for measuring productivity in manufacturing companies. To achieve the research objective, an in depth investigation on the existing productivity measurement and analysis practices of a case manufacturing company has been carried out through both qualitative and quantitative approaches. The investigation result has shown that the...

متن کامل

Performance measurement of detection and governmental punitive agency by integrated approach based on DEMATEL, ANP, and DEA

The detection and governmental punitive agency is responsible for supervision on correct implementation of the business laws in Iran. Several criteria are involved in performance assessment of detection and governmental punitive agency. The interaction between criteria and sub-criteria may occur in real situations. Moreover, the performance measurement should be accomplished in a multi-period h...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011