Ant algorithms for a time and space constrained assembly line balancing problem
نویسندگان
چکیده
The present article focuses on the application of a procedure based on ant colonies to solve an assembly line balancing problem. After an introduction to assembly line problems, the problem under study is presented: the Time and Space constrained Assembly Line Balancing Problem (TSALBP); and a basic model of one of its variants is put forward for study. Subsequently, an ant algorithm is presented that incorporates some ideas that have offered good results with simple balancing problems. Finally, the validity of the proposed algorithms is tested by means of a computational experience with reference instances, and the conclusions of the study are presented. 2005 Elsevier B.V. All rights reserved.
منابع مشابه
A Bi-Objective Approach to an Assembly Line Re-Balancing Problem: Model and Differential Evolution Algorithms
Assembly lines are special kinds of production systems which are of great importance in the industrial production of high quantity commodities. In many practical manufacturing systems, configuration of assembly lines is fixed and designing a new line may be incurred huge amount of costs and thereby it is not desirable for practitioners. When some changes related to market demand occur, it is wo...
متن کاملSolving a multi-objective mixed-model assembly line balancing and sequencing problem
This research addresses the mixed-model assembly line (MMAL) by considering various constraints. In MMALs, several types of products which their similarity is so high are made on an assembly line. As a consequence, it is possible to assemble and make several types of products simultaneously without spending any additional time. The proposed multi-objective model considers the balancing and sequ...
متن کاملAn Extended Beam-ACO Approach to the Time and Space Constrained Simple Assembly Line Balancing Problem
Assembly line balancing problems are concerned with the distribution of work required to assemble a product in mass or series production among a set of work stations on an assembly line. The specific problem considered here is known as the time and space constrained simple assembly line balancing problem. Among several possible objectives we consider the one of minimizing the number of necessar...
متن کاملBeam-ACO Applied to Assembly Line Balancing
Assembly line balancing concerns the design of assembly lines for the manufacturing of products. In this paper we consider the time and space constrained simple assembly line balancing problem with the objective of minimizing the number of necessary work stations. This problem is denoted by TSALBP-1 in the literature. For tackling this problem we propose a Beam-ACO approach, which is an algorit...
متن کاملA cost-oriented model for multi-manned assembly line balancing problem
In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 177 شماره
صفحات -
تاریخ انتشار 2007