Life cycle of a data warehousing project in healthcare.
نویسندگان
چکیده
Hill Physicians Medical Group (and its medical management firm, PriMed Management) early on recognized the need for a data warehouse. Management demanded that data from many sources be integrated, cleansed, and formatted. As a first step, an operational data store (ODS) was built and populated with data from the main transactional system; encounter data were added. The ODS has served its purpose well and has whetted management's appetite for more information and faster, more reliable access, all in one location. PriMed hired Annams Systems Consulting (Annams) for this effort. A team was formed, made up of consultants from Annams and members of PriMed's information services (IS) team. The "classical" approach is being taken: enhancing the ODS, which is largely normalized in structure, and integrating data from various sources, along with enforcing business rules. The team is designing and implementing data marts and a "star schema" style of data modeling--a useful tool for management to evaluate results before investing further.
منابع مشابه
Agile Development in Data Warehousing
Traditional data warehouse projects follow a waterfall development model in which the project goes through distinct phases such as requirements gathering, design, development, testing, deployment, and stabilization. However, both business requirements and technology are complex in nature and the waterfall model can take six to nine months to fully implement a solution; by then business as well ...
متن کاملLife cycle assessment of construction phase of monorail project in Qom, Iran
Transportation is an important part of modern community life as well as one of the largest sources of greenhouse gas emissions in urban communities, the population growth of which can increase transportation capacity. Monorail systems are relatively new rail transportation systems which are currently being designed and constructed in different countries. We have applied the Intergovernmental Pa...
متن کاملLife cycle assessment of construction phase of monorail project in Qom, Iran
Transportation is an important part of modern community life as well as one of the largest sources of greenhouse gas emissions in urban communities, the population growth of which can increase transportation capacity. Monorail systems are relatively new rail transportation systems which are currently being designed and constructed in different countries. We have applied the Intergovernmental Pa...
متن کاملOn the Optimal Frequency and Timing of Control Points in a Project’s Life Cycle
The dynamic nature of projects and the fact that they are carried out in changing environments, justify the need for their periodic monitoring and control. Collection of information about the performance of projects at control points costs money. The corrective actions that may need to be taken to bring the project in line with the plan also costs money. On the other hand, penalties are usually...
متن کاملAn Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment
Effective project management requires reliable knowledge of cash required in different stages of project life cycle. Getting this knowledge is highly dependent on sophisticated consideration of project environment. Nature of projects and their environments are associated with uncertain conditions. In this paper, a new project cash flow assessment method based on project scheduling is proposed t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Journal of healthcare information management : JHIM
دوره 15 2 شماره
صفحات -
تاریخ انتشار 2001