On-line scheduling to minimize average completion time revisited

نویسندگان

  • Nicole Megow
  • Andreas S. Schulz
چکیده

We consider the scheduling problem of minimizing the average-weighted completion time on identical parallel machines when jobs are arriving over time. For both the preemptive and the nonpreemptive setting, we show that straightforward extensions of Smith’s ratio rule yield smaller competitive ratios than the previously best-known deterministic on-line algorithms. c © 2003 Elsevier B.V. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling to Minimize Average Completion Time Revisited: Deterministic On-Line Algorithms

We consider the scheduling problem of minimizing the average weighted completion time on identical parallel machines when jobs are arriving over time. For both the preemptive and the nonpreemptive setting, we show that straightforward extensions of Smith’s ratio rule yield smaller competitive ratios compared to the previously best-known deterministic on-line algorithms, which are (4+ ε)-competi...

متن کامل

An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time

This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...

متن کامل

Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

متن کامل

Role of batch size in scheduling optimization of flexible manufacturing system using genetic algorithm

Flexible manufacturing system (FMS) readily addresses the dynamic needs of the customers in terms of variety and quality. At present, there is a need to produce a wide range of quality products in limited time span. On-time delivery of customers’ orders is critical in make-to-order (MTO) manufacturing systems. The completion time of the orders depends on several factors including arrival rate, ...

متن کامل

Scheduling–lps Bear Probabilities Randomized Approximations for Min–sum Criteria Scheduling–lps Bear Probabilities Randomized Approximations for Min–sum Criteria

In this paper, we provide a new class of randomized approximation algorithms for scheduling problems by directly interpreting solutions to so-called time-indexed LPs as probabilities. The most general model we consider is scheduling unrelated parallel machines with release dates (or even network scheduling) so as to minimize the average weighted completion time. The crucial idea for these multi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Oper. Res. Lett.

دوره 32  شماره 

صفحات  -

تاریخ انتشار 2004