We present an integer programming model for the ferry scheduling problem, improving existing models in various ways. In particular, our model has reduced size in terms of the number of variables and constraints compared to existing models by a factor of approximately O(n), where n being the number of ports. The model also handles efficiently load/unload time constraints, crew scheduling and passenger transfers. Experiments using real world data produced high quality solutions in 12 hours using CPLEX 12.4 with a performance guarantee of within 15% of optimality, on average. This establishes that using a general purpose integer programming solver is a viable alternative in solving the ferry scheduling problem of moderate size.
منابع مشابه
A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملExact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment
This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...
متن کاملA Stochastic Model for Prioritized Outpatient Scheduling in a Radiology Center
This paper discussed the scheduling problem of outpatients in a radiology center with an emphasis on priority. To more compatibility to real-world conditions, we assume that the elapsed times in different stages to be uncertain that follow from the specific distribution function. The objective is to minimize outpatients’ total spent time in a radiology center. The problem is formulated as a fle...
متن کاملComparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints
The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...
متن کاملModeling and scheduling no-idle hybrid flow shop problems
Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This paper considers the problem of scheduling no-idle hybrid flow shops. A mixed integer linear programming model is first developed to mathematically form...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Public Transport
دوره 4 شماره
صفحات -
تاریخ انتشار 2013